Madhya Pradesh State Veterinary Council Draft Electoral Roll for Council's Members Election-2020
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
S.No. Stoppage Time 1 Ayodhya A-Sector 8:25 A.M. 2 Anand Nagar 8:30 A.M
ROUTE NO - 1 (AYODHYA 'A' SECTOR) DRIVER - NARENDRA CONTACT NO - 9770326651 STOPPAGE TIMMING S.NO. STOPPAGE TIME 1 AYODHYA A-SECTOR 8:25 A.M. 2 ANAND NAGAR 8:30 A.M. 3 SONA GIRI 8:34 A.M. 4 KALPANA NAGAR 8:36 A.M. 5 PIPLANI PETROL PUMP 8:38 A.M. 6 MAHATMA GANDHI H.S. SCHOOL 8:42 A.M. 7 AWADHPURI 8:44 A.M. 8 BARKHEDA MARKET 8:46 A.M. 9 SHAKTI NAGAR COMPLEX 8:50 A.M. 10 HABIBGANJ NAKA 8:54 A.M. 11 B. U. 9.05 A. M 12 SCOPE COLLEGE 9:20 A.M. NOTE -: PLEASE COME AT STOPPAGE BEFORE 5 TO 10 MINUTES ROUTE NO - 2 JUBLI GATE DRIVER - KAMAL CONTACT NO - 8889292171 STOPPAGE TIMMING S.NO. STOPPAGE TIME 1 JUBLI GATE 8:20 A.M. 2 ASHOKA GARDEN 8:33 A.M. 3 PRABHAT PETROL PUMP 8:36 A.M. 4 PULL BOGDA 8:38 A.M. 5 BARKHEDI CROSSING 8:42 A.M. 6 BHARAT TALKIES 8:43 A.M. JAHANGIRABAD (NAGAR NIGAM WARD 7 8:52 A.M. OFFICE) 8 P.H.Q. 8:56 A.M. 9 POLICE CONTROL ROOM 8:58 A.M. 10 VITENARY JAIL ROAD 9:00 A.M. 11 SCOPE COLLEGE 9:20 A.M. NOTE -: PLEASE COME AT STOPPAGE BEFORE 5 TO 10 MINUTES ROUTE NO - 3 KAROUND DRIVER - VIRENDRA CONTACT NO - 9669355016 STOPPAGE TIMMING S.NO. STOPPAGE TIME 1 KAROUND 8:05 A.M. 2 KAJI KEMP 8:10 A.M. 3 DIG BUNGLA 8:12 A.M. -
Physico-Chemical and Statistical Analysis of Upper Lake Water in Bhopal Region of Madhya Pradesh, India
International Journal of Lakes and Rivers. ISSN 0973-4570 Volume 13, Number 1 (2020), pp. 1-16 © Research India Publications http://www.ripublication.com Physico-Chemical and Statistical Analysis of Upper Lake Water in Bhopal Region of Madhya Pradesh, India Mohammad Faisal Khan College of Science & Theoretical Studies Saudi Electronic University, Riyadh, KSA. ABSTRACT Lake Water samples were collected from fifteen (15) locations during pre and post monsoon season. The physico-chemical parameters such as Total Alkalinity, Carbonate Alkalinity, Bi-Carbonate Alkalinity, Total Hardness, Ca Hardness, Mg Hardness, Ca Content, Mg Content, Chloride, Phosphate, Total Phosphoras, Organic Phosphoras, Nitrate, Biological Oxigen Demand and Chemical Oxigen Demand were analyzed to know the present status of the lakewater quality. After statistical analysis it was cleared that the positive co-relationship occurred between the attributes and attributes are independent to each other and these varied according to locations. Key words: upper lake, physico-chemical parameters, India. 2010 MSC NO: 62J10, 62H86, 62P12. INTRODUCTION: Upper lake is an east westerly elongated typical tropical lake, was built by king Bhoj of Dhar (1,000-1,055) by constructing a massive earthen structures across Kolans River. The lake has catchment area of 361 km2 with a water submergence length of 12 km and maximum width of 1.75 km at Full Tank Level. Available records reveal that the lake area was approximately 2 km2 in the beginning. In 1963 the water spread area of the lake increased form 13.8 km2 to maximum of 36.1 km2 by constructing 11 radial gates at Bhadbhada waste weir. -
Sl.No. Name Candidates 1. Ms. POONAM SAHU 349, AZAD GANJ, SIPRI BAZAR, CHAWLA NURSING HOME KE PASS , JHANSI - 284003 (U.P.) 2
ICMR - NATIONAL INSTITUTE FOR RESEARCH IN ENVIRONMENTAL HEALTH, BHOPAL Advertisement No.NIREH/HR/PP/2017/01 Dated 31 st August 2017. List of eligible candidates for the written test for the post of Technician - A - 02 Posts (UR) Sl.No. Name Candidates 1. Ms. POONAM SAHU 349, AZAD GANJ, SIPRI BAZAR, CHAWLA NURSING HOME KE PASS , JHANSI - 284003 (U.P.) 2. Mr. GOURISHANKAR VILLAGE POST MAINA , CHOUPDAPURA, TEHSIL ASHTA, DISTT - SEHORE - 466125. (M.P.) 3. Mr. VINAYAK TADAM Q. NO. - 763, N - 2 HABIBGANJ , BHOPAL - 462024 4. Ms. NEHA RAHI H. NO. 164, KUMHARPURA, OLD VIDHAN SABHA, BHOPAL - 462003 5. Ms. REENA KEVAT I - 55/26, SOUTH T.T. NAGAR, BHOPAL - 462003 6. Mr. CHATUREE KUSHWAH PARAKH VOLUNTRY BLOOD BANK , JHANSI (U.P.) - 284128 7. Mr. DILOO SINGH BHILALA ROOM NO. 10, M A JOR DHAYAN CHAND HOCKEY GROUND , NEAR OF MAYUR PARK, LINK ROAD NO. 1, BHOPAL - 462003 8. Ms. PREETI RAIKWAR H. N. - 2080,NEAR GOPAL HOTEL, BEHIND BHAGWATI DAIRY LALMATI, KANCHGHAR, JABALPUR - 482001 (M.P.) 9. Ms. BHARTI NAG RAJENDRA PRASAD WARD, PURANI BASTI WARD NO. - 11, NAINPUR, DISTT. MANDLA - 481776 (M.P.) Sl.No. Name Candidates 10. Mr. NARINDI LAKSHMANA SWAMY D. NO.;2 - 14 - 67,A.A.S COLONY, 20th DIVISION, ELURU, WEST GODAVARI DISTRICT, ANDHRA PRADESH - 534001 11. Mr. ISLAMUDDIN QURESHI ANISUDDIN QURESHI , SITLA MATA ROAD, SELANT MOHALLA , MEGHNAGAR, DISTT. - JHABUA - 457779 12. Mr. PALANISAMY.M NO. 244, MEL ST, ATHIPADI (POST & VI LLAGE), THANIPADI (VIA), THANDRAMPATTU (TK), THIRUVANNAMALAI (DIST.) - 606708 (T.N.) 13. Mr. SAURAV DWIVEDI HOUSE NO. 2 2, NEAR RIDHI SHIDI REST AU RENT, KAROND CHURAHA , BHOPAL - 462038 14. -
Madhya Pradesh
Social Safeguards Compliance Report August 2017 IND: Second Rural Connectivity Investment Program Madhya Pradesh Prepared by National Rural Road Development Agency, Ministry of Rural Development, Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 6 July 2017) Currency unit – Indian Rupees (INR/Rs) INR1.00 = $ 0.01545 $1.00 = INR 64.73 ABBREVIATIONS ADB : Asian Development Bank APs : Affected Persons BPL : Below Poverty Line FFA : Framework Financing Agreement GOI : Government of India GRC : Grievances Redressal Committee IA : Implementing Agency MFF : Multitranche Financing Facility MORD : Ministry of Rural Development MOU : Memorandum of Understanding NC : Not Connected NGO : Non-Government Organization NRRDA : National Rural Road Development Agency MGNREGA : Mahatma Gandhi National Rural Employment Guarantee Act MPRRDA : Madhya Pradesh Rural Road Development Agency PIU : Project Implementation Unit PIC : Project Implementation Consultants PFR : Periodic Finance Request PMGSY : Pradhan Mantri Gram Sadak Yojana RCIP : Rural Connectivity Investment Program ST : Scheduled Tribes TA : Technical Assistance TOR : Terms of Reference TSC : Technical Support Consultants VAP : Vulnerable Affected Person WHH : Women Headed Households GLOSSARY Affected Persons (APs): Affected persons are people (households) who may lose their land or source of livelihood due top the project. It may be all or part of their physical and non-physical assets, irrespective of legal or ownership titles. Encroacher: A person, who has trespassed government land, adjacent to his/her own land or asset, to which he/she is not entitled, by deriving his/her livelihood there. Such act is called “Encroachment.” Gramsabha Resolution: A resolution drawn up by unanimous and collective decision of villagers. The resolution drawn up for the purpose of the project refers to identification of the affected persons, extent of their losses by unique identification and signed consent of the affected persons to donate voluntarily the identified assets for the project purpose. -
District Census Handbook, Bhopal, Part XIII-B, Series-11
"lif XIII -. 'fiT • • ~. ,,1.1-, "T1;cft~ 5I"lImrfif'li 6~J f;{~w", ~;:rqwr;:rr 'itA!' sr~1!f 1981 CENSUS-PUBLICATION PLAN (1981 Cemuv Pub!icatil')m, Series 11 Tn All India Series will be pu!J/is1led ill '!le fJllowing PlJl'1s) GOVERNMENT OF INDIA PUBLiCATIONS Part I-A Administration Report-Enumeration Part I-B Administration Report-Tabulation Part I1.~ General Population Tables Part II-B Primary Census Abstract Part III General Economic Tables Part IV Social and Cultural Tables Part V Migration Tables Part VI Fertility Tables Part VJI Tables on Houses and Diiabled PopulatioD Part VIII llousehold Tables Part IX SJX:cial Tables on Scheduled Castes and Scheduled Tribes Part X-A Town Directory Part x-B Survey Reporti on 5elected Towns Part X-C Survey Reports on selected Villages Part XI Ethnographic Notes and special studie. on Scheduled Castel and Scheduled Tribes Part XII Census Atlas Paper I of 1982 Primary Census Abstra~t for Sc!1eduled Castes and Schedul cd Tribes Paper 1 of 1984 Household Population by Religion of Head or Hou':lehold STATE GOVERNMENT PUBLICATIONS Part XIII-A&B District CetlslIs H:mdbook for each of the 45 districts in the State. (Village and Town Directory and Primary Census Abstract) comE~TS T'O Pages Foreword i-iv Preface v-vi District Map I'llportant Statistics vii Analytical Note ix-xxxiv ~lell'Tl'~lIi fecq-urr, 81'~~f:qa ;snfa 81"h: ari!~t~i.'I' Notes & Explanations, List of Scheduled Castes and Sched uled Tribes Order iil'rr~Tfo Off ~ifr (<<w)arr), mTl1ifi 1976, (Amendment) Act. -
CIN/BCIN Company/Bank Name Date of AGM(DD-MON-YYYY)
Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN L85195TG1984PLC004507 Prefill Company/Bank Name DR.REDDY'S LABORATORIES LTD Date Of AGM(DD-MON-YYYY) 27-JUL-2016 Sum of unpaid and unclaimed dividend 4792072.50 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) NEETA NARENDRA SHAH NA NA NA CHANDRIKA APT.,SHINGADA TALAVW.NO.4016,,NASIKINDIA MAHARASHTRA NASIK DPID-CLID-1201750200019180Amount for unclaimed and unpaid dividend112.50 27-AUG-2017 SANJEEV JAIN SHIKHAR CHAND JAIN 5/2,BLOCK 5,ROOP NAGAR,DELHI INDIA DELHI DELHI DPID-CLID-1203680000025203Amount for unclaimed and unpaid dividend337.50 27-AUG-2017 ARUN KUMAR RADHAKRISHAN A-40,(60.MEATER),POCKET-00,,SECTOR-2,ROHINI,DELHIINDIA DELHI DELHI FOLIOA00001 Amount for unclaimed and unpaid dividend135.00 27-AUG-2017 ASHOK -
S-1 Home AM PM 06:25 AYOD
DELHI PUBLIC SCHOOL, BHOPAL BUS INCHARGE : Mrs. SONA KAPOOR To To School BUS STOP S-1 Home AM PM 06:25 AYOD. NG. SQUARE 03:05 06:30 KAKDA ABHINAV HOME 03:00 06:35 GEET BUNGLOW 02:55 06:40 SAGAR AVENUE 02:50 06:42 NARELA SANKRI 02:48 06:45 VRINDAVAN NG / QUEEN MERRY SCHOOL 02:45 06:50 ST. PAUL SCHOOL 02:40 06:55 J.K. ROAD CROSSING 02:35 07:30 SCHOOL 02:00 BUS INCHARGE : Mrs. RUPALI PATANKAR To To School BUS STOP S-2 Home AM PM 06:30 INDUS TOWN SEVA SADAN 03:00 06:35 MISROD (POLICE STATION) 02:55 06:38 SHRIRAM COLONY 02:52 CHINAR FOURTUNE (INSIDE) 06:42 02:48 SHOPING MALL 06:45 DANISH NAGAR (MAIN RD.) 02:45 06:48 AHMEDPUR CROSSING 02:42 06:52 NARAYAN NG. / BU BHOPAL 02:38 06:55 RLY COLONY (DRM OFFICE) 02:35 07:00 KASTURBA HOSPITAL 02:30 07:05 CONGRESS BHAWAN 02:25 07:30 SCHOOL 02:00 DELHI PUBLIC SCHOOL, BHOPAL BUS INCHARGE : Mrs. RAKHSHAN ANSARI To To School BUS STOP S-3 Home AM PM 06:25 CHIRAYU MEDICAL COLLEGE 03:05 06:30 BAIRAGARH CHANCHAL CHOWRAH 03:00 06:35 BAIRAGARH (POLICE STATION) 02:55 06:40 TVS SHOWROOM 02:50 06:42 HALALPURA / DEVI MANDIR 02:48 06:45 TATA SHOWROOM / VIJAY NAGAR 02:45 06:50 KOH-E-FIZA HOSPITAL 02:40 07:10 23RD BATALIAON NR. SAHYADRI 02:20 07:30 SCHOOL 02:00 BUS INCHARGE : Mrs. SUSHMA SINGH To To School BUS STOP S-4 Home AM PM SPRING VELLY (KATARA HILLS) / PARAS 06:20 03:10 CITY 06:25 SANT ASHARAM NR. -
MADHYA PRADESH JAL NIGAM BHOPAL Request for Proposal
MADHYA PRADESH JAL NIGAM BHOPAL Request for Proposal (RFP Document) CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR MULTI VILLAGE SCHEME (MVS) FOR VILLAGES OF SHAJAPUR DISTRICT OF MADHYA PRADESH INCLUDING SURVEY & INVESTIGATION, SOURCE STUDY & ASSESSMENT, DESIGN, DRAWING, COST ESTIMATES, TECHNICAL SPECIFICATIONS AND BILL OF QUANTITIES, ETC. COMPLETE NIT No. 38/PROC/MPJN/2019-20 Dated 18.02.2020 DETAILS OF SCHEME Estimated Cost Estimated Stage I Consultancy District Name of Scheme Cost of DPR Work (PAC) (Rs. in Crore) (Rs. in Lakh) Shajapur Shajapur MVS 1060.00 265.00 MANAGING DIRECTOR Madhya Pradesh Jal Nigam "D" Wing, IInd Floor, Vindhyachal Bhawan, Bhopal - 462004 Phone No.: 0755-2579034-35-36 Website: www.mpjalnigam.mp.gov.in NIT for Selection of Consultant for DPR Preparation - Shajapur MVS INDEX NOTICE INVITING E-TENDER .................................................................................................... 3 IMPORTANT POINTS FOR GUIDANCE OF THE CONSULTANTS ......................................... 5 DETAILED NOTICE INVITING TENDERS ................................................................................. 8 1. INTRODUCTION ................................................................................................................. 9 2. RATES ................................................................................................................................... 9 3. SUBMISSION OF TENDER ............................................................................................... -
Indian Archaeology 1987-88 a Review
INDIAN ARCHAEOLOGY 1987-88 —A REVIEW EDITED BY M.C.JOSHI Director General Archaeological Survey of India PUBLISHED BY THE DIRECTOR GENERAL ARCHAEOLOGICAL SURVEY OF INDIA NEW DELHI 1993 Cover : TisseruStupa,Leh,Ladakh Cover layout & design: Raj Nath Kaw 1992 ARCHAEOLOGICAL SURVEY OF INDIA GOVERNMENT OF INDIA Price :Rs. 250.00 PRINTED AT BENGAL OFFSET WORKS, 335, KHAJOOR ROAD, KAROL BAGH, NEW DELHI-1 10005. PHONE: 524200,7510455 PREFACE I am happy to place before the scholars the Indian Archaeology 1987-88—A Review not very long after the publication of the previous issue. We are making efforts to bring the publication of the Review up to date; this, however, would depend on timely submission of material by contributors. It has been our experience that, in many cases, several reminders have to be given for sending material to us for inclusion in the Review which results in delay of its publication. I am sure, with the cooperation of different institutions and the State Departments of Archaeology and Museums and my own colleagues in different Branches and Circles of the Survey it would be possible for us to maintain regularity of its publication. The present issue of the Review is more voluminous than the previous ones and thus reflects also increased activities in different fields of archaeology. Out of several excavations reported in this issue, I may mention the work at Banawali, Thanesar, Sanghol, Hampi, Sannathi, Daulatabad, Lalitagiri, Udaigiri, Fatehpur Sikri, Sravasti, Balikeshwar, Chandel, Harsud, etc. by the Survey, at Kuntasi jointly by the Deccan College, Pune, and the Gujarat State Department of Archaeology, at Mangalkot by the University of Calcutta, at Kotasur by the Visvabharati, Maihar by the Allahabad University, Ganeshwar by the Department of Archaeology and Museums, Rajasthan State and at Shikarpur by the Department of Archaeology, Government of Gujarat. -
District Census Handbook, Bhopal, Part XIII-A, Series-11
'11tT XIII-CR ~'I~'Co 11 • • 1981 C.~NSUS-PUBLICATION PLAN (1981 Celtrll> Publicati'JllY, Series 11 in AlII"dl:J Series wIll be publislted in the following Prl,uts) GOVERNMENT OF INDIA PUBLICA nONS Part I-A Administration Report-Enumeration Part I·B Administration Report-Tabulation Part II·A General Population Tables Part II·B Primary Census Abstract Part III General Economic Tables Part IV Social and Cultural Tables Part V Migration Tables Part VI Fertility Tab!es Part VII Tables on Houses and Disabled Population Part VIII Household Tahles Part IX Special Tables on Scheduled Castes and Scheduled Tribes Part X-A Town Directory Part X-B Survey Report. on selected Towns Part X-C Survey Reports on selected Villages Part XI Ethnographic Notes and special studies on :scheduled Castes and Scheduled Tribes Part XII Census Atlas Paper I -of 1982 Primary Census Abstract for Scheduled Castes and Scheduf ed Tribes Paper 1 of 1984 Household Population by Religion of Head of Houo;ehold STATE GOVERNMENT PUBLICATIONS Part XIII-A&B District Census Handbook for each of the 45 districts in the State. (Village and Town Directory and Primary Census Abstract) CONTENTS crto.. ij'~lfT Pages 1 ~'f;r Foreword ;-iv 2 ~'(Cf"fT Preface v-vi 3 f~ ~ if1.f!ll'T Distri(;t Map 4 if~~:Jf~ artCfi~ Important Statistics vii 5 fat1lilrq1Jf'f~ifi {?;cqvr"t Analytical Note xxi-xxxiv ~Cififi RCtJurT : ar2;~m iiIlfff ait~ ar.t~a Notes & Explanations; List of Scheduled Gf"f"TTrn- Ofil' ~T. ( ~w)F1;r ), mlfi 1 976; Castes and Scheduled Tribes Order ~T iif'l'lTur;;T 9;ila-IfiT !fiT ~fuijJ~ ar1~ ~~ I (Amendment) Act, 1976. -
Iper Ug Bus Route 2019 Bus Route No 1 : Bus Co-Ordinator - Mr
IPER UG BUS ROUTE 2019 BUS ROUTE NO 1 : BUS CO-ORDINATOR - MR. MANISH BHARANI BAIRAGARH KALI MANIDR – KOH-E-FIZA – ROSHANPURA - 6 No. - NAKA PARKING - IPER BUS ROUTE BUS STOP TIME (AM) BAIRAGARH BAIRAGARH KALI MANDIR 08.40 BAIRAGARH NAGAR NIGAM STOP 08.42 BAIRAGARH ALLAHABAD BANK BUS STOP 08.46 BAIRAGARH BAIRAGARH BUS STAND 08.50 HALALPUR BUS STAND HALALPUR BUS STAND 08.55 KOH-E-FIZA (VIP ROAD) KOH-E-FIZA (VIP SQUARE) 09.00 NEWMARKET ROSHANPURA 09.08 6 NO. STOP 6 NO. STOP 09.13 HBJ STATION HBJ STATION (2ND ENTRY) 09.20 HBJ NAKA HBJ NAKA PARKING 09.22 IPER IPER CAMPUS 09.50 FOR BUS ENQUIRY CONTACT : MR. HARISH PRAJAPATI , CELL NO. : 8349528304, 9575801404 NOTE : NO STUDENT WILL BE ALLOWED TO TRAVEL WITHOUT A BUS PASS. EVERY PERSON HAS TO REACH FIVE MINUTES EARLY ON THEIR STOP. TIME SCHEDULE OF BUS IS TENTATIVE AND NO GUARANTEE IS GIVEN TO THE STRICT ADHERENCE OF TIME. ABOVE MENTIONED BUS STOPS ARE SUBJECT TO CHANGE IN CASE OF LESS THAN 5 STUDENTS. THE INSTITUTE WILL NOT BE RESPONSIBLE IN CASE OF DELAY IN SUSPENSION OF BUS SERVICES, DUE TO UNFORESEEN CIRCUMSTANCES IPER UG BUS ROUTE 2019 BUS ROUTE NO : 2 BUS CO-ORDINATOR – MR. RAM KUMAR YADAV KAROND – DIG- NADRA- BHARAT- PRABHAT–CHETAK–NARMADA –RRL- IPER BUS ROUTE BUS STOP TIME (AM) KAROND KAROND SQUARE 08.40 D.I.G. D.I.G. 08.44 SINDHI COLONEY SINDHI COLONEY 08.46 BHOPAL TALKIES BHOPAL TALKIES 08.48 NADRA BUS STAND NADRA BUS STAND 08.50 BHOPAL RAILWAY STATION BHOPAL RAILWAY STATION 08.52 BHARAT TALKIES BHARAT TALKIES 08.55 BARKHEDI NAKA BARKHEDI NAKA 08.58 PUL BOGDA PUL BOGDA 09.00 PRABHAT PETROL PUMP PRABHAT SQUARE 09.02 SHANTI NIKETAN WAY TO CHETAK BRIDGE 09.05 CHETAK BRIDGE CHETAK BRIDGE BUS STOP 09.08 ISBT ISBT 09.12 NARMADA CLAUB NARMADA CLUB 09.15 RRL RRL 09.19 IPER IPER CAMPUS 09.40 FOR BUS ENQUIRY CONTACT : MR. -
Language Handbook, Chhindwara, Betul, Hoshangabad, Nimar And
MADHYA PRADESH CENSUS 1951 LANGUAGE HANDBOOK Chhil1dwara, Betul, Hoshangabad, Nimar and Balaghat Districts By H. N. BANERJEE, M.Sc., LL.B. Of the Madhya Pradesh Civil SerVice, Superintendent of Census Operations, IHadhya Pradesh NAG-PUR GOVERNMENT PRINTING, MADHYA PRADESH 1"956 PREFACE At the 1951 Census, the data relating to mother-tongue were tabulated not by villages but by larger units called tracts. The tracts were of three kinds-rural, urban city and urban non-city. A rural tract normally consisted of the entire rural area of a tahsil. The urban city tract consisted of a city of one lakh or over one lakh population only and the urban non-city tract com prised all the towns within a district: 2. In October 1954, the Government of India communicated to the State Government their decision to obtain language data according to villages for all the multi-lingual border tahsils in India by means of a special sorting of the 1951 Census slips. They also sent a tentative list of 29 tahsils, indicating the languages in respect of each, for which they proposed to under take the 0 peration in this State. The list was prepared as follows. The dis trictwise linguistic figures of the 1951 Census were plotted on the map of Madhya Pradesh. A line was drawn separating the districts with different languages in aboolute maJority. All the tahsils lying on either side of this line were included in the list. The State Government agreed to share the cost of this operation for Madhya Pradesh equally with the Central Government.