Hertfordshire County Council Local Transport
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Responses to the Rail Strategy Consultation Page 1 West Anglia
Responses to the Rail Strategy Consultation Appendix1 West Anglia Mainline Organisation Consultation Comments - WAML HCC Response Action for Rail Strategy Broxbourne 4-tracking & CR2 to be given higher profile - Include CR2 on page 14 but Borough Council e.g. on pages 4 & 32 & in figure 2.2 on page not on pages 4 & 32 as 14. Include Ambition Broxbourne's aspiration these figures list existing of Cheshunt as strategic hub with CR2, links services and lines. Include to Stratford, London & Stansted, and reference to Ambition significant development around the station Broxbourne's aspiration of associated with a potential redevelopment of Cheshunt as strategic hub, Delamare Road. Include lobbying for early and of lobbying for early safeguarding of regional CR2 route. CR2 safeguarding of regional route. Cambridgeshire Include addressing single track tunnel at Single track tunnel at None. County Council Stansted to improve journey times & capacity Stansted as constraint for all services, from the north & south. already included in Strategy. East Herts District Objects to wording on page 41 re - HCC not pursuing Hertford Council investigation into the implementation of East as CR2 terminus and development around Hertford East branch so text will be removed. stations. Serious constraints of implementing Amend text on page 40 re CR2 in East Herts should be recognised. Ware platform. There was never a second platform at Ware (page 40). Hertford Town Appropriate service mix with more semi-fasts - Include reference to semi- Council to London, and longer term to Liverpool St. fasts including to Liverpool St. Hertfordshire Lobby for Hertford East & Harlow as northern HCC not pursuing Hertford None. -
Watford Station Closure Panel
Watford Station Closure Panel Document L Final Report, 28 08 2012 Author: Vincent Stops Final report of the consideration by London TravelWatch of the proposed closure and discontinuance of services to and from Watford station 1 Purpose of report 1.1 To set out the background and process undertaken as part of the consideration of the proposed closure and discontinuance of services to and from Watford station. 1.2 To summarise London Underground Limited’s (LUL’s) case for the closure, the concerns of passengers and the conclusions of Panel members consideration of the issues. 1.3 To report to the Mayor of London any hardship that would result from the closure, should it proceed. 1.4 To report to the Mayor of London measures that would alleviate hardship resulting from the closure, should it proceed. 1.5 To report any other conclusions from London TravelWatch’s consideration of the closure. 2 Background 2.1 Watford station is one of the northern terminal stations on the Metropolitan line. There is a long-standing aspiration to divert the Metropolitan line, via the former Croxley Green branch line, to terminate at Watford Junction station. This would entail a short section of new railway being built to connect the Metropolitan line to the former Croxley Green branch line. The Link would have two new accessible stations at Ascot Road and Vicarage Road and connect to Watford Junction station via Watford High Street station. The project is known as the Croxley Rail Link. See Appendices A & B below for schematics of the existing and proposed Metropolitan line. -
High Speed Rail
House of Commons Transport Committee High Speed Rail Tenth Report of Session 2010–12 Volume III Additional written evidence Ordered by the House of Commons to be published 24 May, 7, 14, 21 and 28 June, 12 July, 6, 7 and 13 September and 11 October 2011 Published on 8 November 2011 by authority of the House of Commons London: The Stationery Office Limited The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its Associate Public Bodies. Current membership Mrs Louise Ellman (Labour/Co-operative, Liverpool Riverside) (Chair) Steve Baker (Conservative, Wycombe) Jim Dobbin (Labour/Co-operative, Heywood and Middleton) Mr Tom Harris (Labour, Glasgow South) Julie Hilling (Labour, Bolton West) Kwasi Kwarteng (Conservative, Spelthorne) Mr John Leech (Liberal Democrat, Manchester Withington) Paul Maynard (Conservative, Blackpool North and Cleveleys) Iain Stewart (Conservative, Milton Keynes South) Graham Stringer (Labour, Blackley and Broughton) Julian Sturdy (Conservative, York Outer) The following were also members of the committee during the Parliament. Angie Bray (Conservative, Ealing Central and Acton) Lilian Greenwood (Labour, Nottingham South) Kelvin Hopkins (Labour, Luton North) Gavin Shuker (Labour/Co-operative, Luton South) Angela Smith (Labour, Penistone and Stocksbridge) Powers The committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication The Reports and evidence of the Committee are published by The Stationery Office by Order of the House. -
The Evolution of Train Services on the Met and Gc Line
THE EVOLUTION OF TRAIN SERVICES ON THE MET AND GC LINE by Eric Stuart (Readers may find reference to the Four-Tracking article in the July 2018 issue of Underground News helpful) After the Great Central (GC) arrived at Quainton Road and the service south thereof became established, both the GC and the Metropolitan Railway (Met.) provided services. However, the personalities at the heads of the two companies did not enjoy the best of relationships. Matters came to a head when a GC train crashed when failing to reduce speed over the (then) reverse curve into Aylesbury station in 1904. About that time, both the leaders retired and a period of better relations between the companies began. On 2 April 1906, the Metropolitan & Great Central Joint Railway (MGCJR) was created. This latter took over the lines of the Metropolitan Railway north and west of Harrow South Junction, with the exception of the branch to Uxbridge. These included the main line between Harrow-on-the-Hill and Verney Junction and the branch from Chalfont & Latimer to Chesham. The MGCJR was created under the terms of the Metropolitan & Great Central Railway Act, which received Royal Assent on 4 August 1905. At the same time, the Great Central and Great Western Joint Railway was formed, covering the lines south of Aylesbury via Princes Risborough to Northolt Junction. This was the result of a new line that aided the GC by partly avoiding congestion on the Met. and also giving the Great Western a shorter route to Birmingham1. One curiosity was that a Joint Committee was set up to manage a new Aylesbury station, jointly owned by two joint railways! Some points on terminology: The new line was commonly called just ‘The Joint Line’ and, even in later LT days, some staff still belonged to a particular class that made them feel superior to others2. -
ED142 : NHDC Final Response to Inspector's Actions Arising out of The
ED142 : NHDC Final response to Inspector’s Actions arising out of the Hearing Sessions Matter 6 – Deliverability Action Date on which Examination Doc Action Completed Reference No. • NHDC to provide updated version of Table A of Matter Enclosed as ED142 Appendix M6-1 6 Hearing Statement (to include infrastructure for other allocated sites (i.e. not housing sites)) and the Housing Trajectory • NHDC to provide updated Infrastructure Delivery Plan 23/01/ 2018 ED73 • Infrastructure Delivery Plan Appendix A 23/02/2018 ED73a Enclosed As Appendix M6-2 • Hertfordshire County Council to provide suggested 21/02/2018 ED105 Enclosed as additional/amended wording in the Plan regarding Appendix M6-3 transport issues for consideration by NHDC MM028, MM031, MM032 and MM033. • NHDC to liaise with Stevenage Borough Council with Enclosed as ED142 Appendix M6-4 regard to additional/amended wording • NHDC to provide note clarifying transport position 08/02/2018 ED86 Enclosed as with regard to B656 between Codicote and Appendix M6-5 Knebworth as raised by Mr Bamber of Save Rural Codicote • NHDC to provide note clarifying whether or not 08/02/2018 ED85 Enclosed as transport modelling shows that there is a need for a Appendix M6-6 southern bypass for Hitchin during the Plan period Appendix M6 – 1 ED142 : Note on Matter 6 / Table A – Infrastructure provision NORTH HERTFORDSHIRE DISTRICT COUNCIL LOCAL PLAN EXAMINATION ED142: MATTER 6 Note to Inspector Matter 6 / Table A – Infrastructure provision 1. Following the hearing sessions for Matter 6 (Deliverability), the following action has been specified: • NHDC to provide updated version of Table A of Matter 6 Hearing Statement (to included infrastructure for other allocated sites (i.e. -
(Hitchin (Cambridge Junction)) Order
NETWORK RAIL INFRASTRUCTURE LIMITED TRANSPORT AND WORKS ACT 1992 THE NETWORK RAIL (HITCHIN (CAMBRIDGE JUNCTION)) ORDER TOWN AND COUNTRY PLANNING ACT 1990: REQUEST FOR DEEMED PLANNING PERMISSION TRANSPORT AND WORKS (INQUIRIES PROCEDURE) RULES 2004 DfT Ref: TWA/09/APP/05 CLOSING SUBMISSIONS ON BEHALF OF THE APPLICANT, NETWORK RAIL INFRASTRUCTURE LIMITED INTRODUCTION 1. These closing submissions follow the format of the SS Statement of Matters. Before embarking on the exercise, however, it is worth reviewing the position now reached with respect to the objections which made the inquiry necessary. 2. All the landowners (freeholders and those with rights in land) whose interests would be compulsorily acquired under the Order have either withdrawn their objections or are imminently expected to (NHDC, EDF, AWA, NG, Prime Estates, the farm interests etc.); or have not appeared to pursue them (SITA) content, presumably, to rely on their rights under the Compensation Code. AWA are now satisfied that their interests can be secured by the Schedule 12 protective provisions; as are the other statutory utility providers EDF and NG. 3. The objections of the statutory authorities have also been withdrawn. Natural England (who did not object) are content that ecological interests affected by the Order Works, particularly in the Burymead Springs area, can be adequately conserved and protected by conditions (DM Appendix th 7: Minutes of the 11 March 2010 Area Planning Officer’s advice to Committee). The Environment Agency have withdrawn their objection having reached common ground with NR on the protective provisions in Schedule 13 (EA email th 6 May and ‘Statement of Common Ground’). -
Strategic Spatial Planning Officer Liaison Group Fifth Meeting – Tuesday, 05 May 2015, 9.30 Am Committee Room 3, City Hall, Queen’S Walk, London
Strategic Spatial Planning Officer Liaison Group Fifth meeting – Tuesday, 05 May 2015, 9.30 am Committee Room 3, City Hall, Queen’s Walk, London Agenda 1 Apologies 2 Notes of 30 Jan 2015 meeting (Richard Linton, GLA) http://www.london.gov.uk/sites/default/files/Action%20Notes.pdf 3 2015 London Plan (Richard Linton, GLA) and 2050 Infrastructure Plan published (Jeremy Skinner, GLA) http://www.london.gov.uk/priorities/planning/london-plan/further-alterations-to-the- london-plan http://www.london.gov.uk/priorities/business-economy/vision-and-strategy/infrastructure- plan-2050 4 Review of LEP’s Strategic Economic Plans (Lee Searles) Final report herewith 5 Summit follow-up: Roundtable Discussion Note (John Lett, GLA) Views? – Roundtable Note plus Notes of Wider South East Summit herewith 6 Possible SSPOLG Work Programme (All) Potential items for discussion: 1) Towards consistent demographics (ONS / CLG 5 or 10 years / GLA Demographics) 2) Towards consistent employment projections (Oxford Economics / GLA / others?) 3) Productivity and skills – regional dimension 4) Transport infrastructure (2005 Commuter Study update / TfL Work Programme) and other e.g. digital infrastructure 5) Regional freight issues (road / rail / ports) 6) Local Economic Partnerships’ infrastructure asks – regional / sub-regional 7) What could ‘devolution’ mean for the wider South East? 8) Environment: water / waste / energy / climate change – regional dimension 9) Potential future geographies of growth 7 AOB / next meeting Working Group members Richard Linton GLA (Chair) -
Hitchin Urban Transport Plan
Hitchin Urban Transport Plan May 2011 Volume 1 Hitchin Urban Transport Plan 0300 1234 047 www.hertsdirect.org Table of Contents Glossary of Terms ............................................................................................ 0 1 Introduction ............................................................................................ 2 1.1 Introduction .................................................................................... 2 1.2 Structure of the Document ............................................................. 2 2 Background to the UTP Area ................................................................ 4 2.1 Background to the UTP Area ......................................................... 4 2.1.1 Population ...................................................................................... 4 2.1.2 Mode Share ................................................................................... 5 2.1.3 Road Network ................................................................................ 5 2.1.4 Public Transport ............................................................................. 6 2.1.5 Walking .........................................................................................10 2.1.6 Cycling ..........................................................................................10 2.2 Road Side Interviews ....................................................................10 2.3 Development Growth ....................................................................13 2.3.1 Existing -
1 a Report by Sawtag Opposing
A REPORT BY SAWTAG OPPOSING THE CLOSURE OF WATFORD METROPOLITAN STATION AND ITS ASSOCIATED ROUTE. ALL OF THESE ARE TO BE SAFEGUARDED UNDER EXTRACTED GOVERNMENT POLICY. This report opposes the closure of Watford (Metropolitan Line) Station on three major grounds. 1 Retaining peak, football and special traffic, and positively building up traffic. Both the Metropolitan Line and WCML/Watford Suburban Lines serve nearby Wembley Stadium extremely well already. Also, train portion working must be advanced to best practice elsewhere. 2 Facilitating the forming of an extended London Overground network, through the extracted Government Policy of better protection, critical in developing rail infrastructure and interchange. 3 Essential safeguards are to be put in place to protect the truncated alignment through Watford (Metropolitan Line) Station. Firstly , it is essential the latter station is retained at least for continued peak hours services, in view of the steadily increasing peak and general use of both the London Metropolitan Underground and Network Rail West Coast Main Line centered system. Safeguarding is also essential in order to serve during the interim for Watford Football Club traffic attending the Vicarage Road Stadium. Pending the establishment of a new station; immediately South of the Stadium on the new Croxley Link Line; Watford (Met) Station is to be kept open for both peak and Football traffic with requisite direct connecting buses. These connecting buses will run from a retained Watford Metropolitan Station direct to the Stadium. There was a railway triangle immediately South of the Stadium, and Croxley Moor alternatives (reference no. 8) to the Croxley Link Project; investigated both linking the Rickmansworth LNWR branch corridor west to the Rickmansworth (Met) Main Line towards Aylesbury, and generally reinstating the pre-Beeching railway triangle inter alia. -
PETITION: Get Croxley Rail Link Back on Track
PETITION: Get Croxley Rail Link Back on Track Sign our petition for the UK Government to restart construction on the Croxley Rail Link The UK Government has pledged a 'New Deal for Britain' to deliver vital infrastructure. In his speech on June 30th the Prime Minister set out plans to 'build back better' in the wake of coronavirus and has pledged £5bn to accelerate infrastructure projects. The Croxley Rail Link was first approved in 2011 by then Lib Dem Transport Minister Norman Baker. However, there has been significant frustration within the local community that the plan to extend the Metropolitan Railway was effectively shelved in 2019 by Mayor of London Sadiq Khan after initial works had been completed. The MLX project has already utilised funds from Hertfordshire County Council and we believe the current situation effectively wastes this public money. We, the undersigned, call for the Government to allocate sufficient funds to restart and complete the Metropolitan Line Extension project and realise the planned benefits to Croxley Green and surrounding area. When complete, please return (as soon as possible) to: Three Rivers Liberal Democrats, 271 Baldwins Lane, Croxley Green, WD3 3LH Full name Postcode Email address Signature No more room? Sign online or print more sheets at SignMe.org.uk/1722 or scan the QR code on your phone Published and promoted by Three Rivers Liberal Democrats, 12 Basildon Close, Watford, WD18 8WL If you add your details to this petition, The Liberal Democrats will use your contact details to send you information on the topics you have requested. Any data we gather will be used in accordance with our privacy policy at threeriverslibdems.org.uk/en/privacy. -
Home Farm, Dane End, Ware, Hertfordshire, Sg12 0Ll
FOR SALE A residential development site for 23 dwellings (24,970 sq. feet), 4 commercial units (4,553 sq.feet) and 2 agricultural buildings, with a resolution to grant planning HOME FARM, DANE END, WARE, HERTFORDSHIRE, SG12 0LL Note: CGI is indicative as building orientations have been adjusted in the planning permission OPPORTUNITY INTRODUCTION King & Co are pleased to offer for sale the following site in Dane End, East Hertfordshire. The site benefits from a resolution to grant detailed planning permission for part conversion and part demolition of the existing buildings to provide a mixed-use development. The scheme will include four commercial units (4,553 sq.ft.) and 26 new family homes, 10 of which will comprise of affordable dwellings. King & Co secured an option to purchase in 2018 and have elected to sell upon receipt of detailed planning permission. OPPORTUNITY King & Co & the landowners are inviting bids on the basis of a land sale with the vendor retaining three units. DEAL STRUCTURE Bids for the freehold are invited on the basis of 23 plots (10 affordable and 13 private) for sale. Plots H01, H02 and H26 are to be delivered as serviced land only as they will be retained by the vendor. As a separate offer, bidders are invited to provide a separate price for the delivery of these three plots to practical completion. The specification for the fit out will be identical to the private accommodation and in accordance with the planning permission and statutory requirements. The Retained Units are shaded green on the plan below. HOME FARM, DANE END, WARE, HERTFORDSHIRE, SG12 0LL SUMMARY OFFER BASIS We are therefore seeking offers on two bases. -
Identifying the Benefits of an Improved Understanding of Network Rail's Costs and Cost Drivers | Final Report
Identifying the benefits Office of Rail Regulation of an improved understanding of Network Rail's costs and cost drivers Final Report Our ref: P22781801 May 2015 Client ref: ORR/CT/14-58 Identifying the benefits Office of Rail Regulation of an improved understanding of Network Rail's costs and cost drivers Final Report Our ref: P22781801 May 2015 Client ref: ORR/CT/14-58 Prepared by: Prepared for: Steer Davies Gleave Office of Rail Regulation 28-32 Upper Ground One Kemble Street London SE1 9PD London WC2B 4AN +44 20 7910 5000 www.steerdaviesgleave.com Steer Davies Gleave has prepared this work for Office of Rail Regulation. This work may only be used within the context and scope of work for which Steer Davies Gleave was commissioned and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this work without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this work using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. Contents Executive Summary ....................................................................................................................... i Introduction ..................................................................................................................................