Federal Register/Vol. 71, No. 165/Friday, August 25, 2006/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Federal Register / Vol. 71, No. 165 / Friday, August 25, 2006 / Notices 50499 communications system, the need to Issued in Washington, DC on August 22, between milepost 0.00 Arlington Yard conduct a 30-day test period of the radio 2006. Station and milepost 4.41 in Richmond communications system before exit gate Grady C. Cothen, Jr., County, a distance of 4.41 miles. installation, and the need to install Deputy Associate Administrator for Safety Included within the North Shore Line advance warning signs before the 24- Standards and Program Development. segment are all tracks in Arlington Yard hour new quiet zone takes effect. The [FR Doc. E6–14112 Filed 8–24–06; 8:45 am] together with lead tracks on both the City and BNSF seek to retain the current BILLING CODE 4910–06–P east and west ends of the yard, the so- partial quiet zone in order to avoid called Wye Connector, that provides a disruption and confusion in the interim direct connection to the Travis Branch and state that safety will not be DEPARTMENT OF TRANSPORTATION from the North Shore Line and a track compromised. designated as the Travis Lead that Surface Transportation Board Interested parties are invited to provides a connection to and from the participate in these proceedings by [STB Finance Docket No. 34908] Travis Branch to the east end of submitting written views, data or Arlington Yard.4 comments. Each comment shall CSX Transportation, Inc., Norfolk The parties have concurrently filed a specifically set forth the basis upon Southern Railway Company, and petition for exemption in STB Finance which it is made and contain a concise Consolidated Rail Corporation— Docket No. 34909, CSX Transportation, 1 statement of the interest of the Modified Rail Certificate Inc., Norfolk Southern Railway commenter in the proceeding. FRA does On August 8, 2006, CSX Company, and Consolidated Rail not anticipate the need to schedule a Transportation, Inc. (CSXT), Norfolk Corporation—Joint Use and Operation public hearing in connection with this Southern Railway Company (NSR), and Exemption, wherein they are seeking proceeding since the facts do not appear Consolidated Rail Corporation (Conrail) approval to provide for the joint use of, to warrant a hearing. If any interested (collectively, the parties) filed a notice and joint rail freight operations over, party desires an opportunity to for a modified certificate of public this line. comment, they should notify FRA in convenience and necessity under 49 No rail service has been provided over writing within 15 days of the date of CFR part 1150, subpart C, Modified the line in more than 15 years. The publication of this notice and specify Certificate of Public Convenience and provision of freight rail service in this the basis for their request. Necessity, to provide rail freight proceeding is a component of the Staten All communications concerning these operations jointly and severally over Island Railroad Revitalization Project, a proceedings should identify the docket 7.69 miles of abandoned rail line of the joint effort between the Port Authority number set forth above and must be former Staten Island Railway and NYCEDC. The parties will provide submitted to the Docket Clerk, DOT Corporation (SIRR) in New York and rail freight operations over the line Docket Management Facility, Room PL– New Jersey lying generally between the pursuant to an operating agreement as 401 (Plaza Level), 400 7th Street, SW., Conrail Chemical Coast Line and points part of the project.5 That operating Washington, DC 20590. on Staten Island, NY.2 The line consists agreement, between the parties and Communications received within 30 of two segments as follows: (a) The NYCEDC, as administrator, provides for days of the date of this notice will be North Shore Line between the end of the parties to manage and maintain the considered by FRA before final action is track at milepost 4.6 at Union Avenue line. The parties indicate that operations taken. Comments received after that east of Arlington Yard, Richmond over the line are scheduled to date will be considered as far as County, NY, and milepost 7.4, via the commence on October 1, 2006 6 and practicable. FRA reserves the right to Chemical Coast Connector, at the continue for a 10-year term, which is grant temporary relief to avoid lapse of proposed point of switch at the renewable for an additional 10 years. the existing partial quiet zone while the connection between the Chemical Coast According to the parties, they will not comment period is open, after Connector and Conrail’s Chemical Coast be obligated to commence operations consideration of any comments filed Line in Union County, NJ, a distance of and assume responsibility until the prior to the initial date of decision. All 2.8 miles;3 and (b) the Travis Branch operating agreement has been signed written communications concerning this and is fully in effect, which, among proceeding are available for 1 The parties were previously granted similar other actions, requires that: (1) examination during regular business authority in CSX Transportation, Inc., Norfolk Reconstruction of the line by NYCEDC Southern Railway Company, and Consolidated Rail hours (9 a.m.–5 p.m.) at the above Corporation—Modified Rail Certificate, STB is completed, Conrail has inspected the facility. All documents in the public Finance Docket No. 34473 (STB served Mar. 19, docket are available for inspection and 2004). They have concurrently filed a notice of between the SIRR trackage and the Chemical Coast copying on the Internet at the docket intent to terminate service authorized in that Secondary Line, and operations thereover, did not proceeding, stating that they did not conclude an require Board approval. The parties will reach this facility’s Web site: http://dms.dot.gov. agreement with the New York City Economic segment via the connector. Anyone is able to search the Development Corporation (NYCEDC) and the Port 4 On October 29, 2003, NYCEDC filed a petition electronic form of all comments Authority of New York and New Jersey (Port for a declaratory order seeking certain Authority) in order to be able to commence determinations as to the Travis Branch. See The received into any of our dockets by the operations. New York City Economic Development name of the individual submitting the 2 See Staten Island Railway Corporation— Corporation—Petition for Declaratory Order, STB comment (or signing the comment, if Abandonment Exemption—in Richmond County, Finance Docket No. 34429 (STB served July 15, submitted on behalf of an association, NY, Docket No. AB–263 (Sub-No. 2X) (ICC served 2004), in which the Board granted the request, business, labor union, etc.). You may July 3, 1990), and Staten Island Railway finding that the proposed construction project did Corporation—Abandonment, Docket No. AB–263 not require agency authorization and that federal review the Department of (Sub-No. 3) (ICC served Dec. 5, 1991). The lines preemption applied. Transportation’s complete Privacy Act were subsequently acquired by NYCEDC and the 5 That agreement is attached as an exhibit to the Statement, which was published in the Port Authority. notice. Federal Register on April 11, 2000 3 On January 21, 2004, the Board served a 6 The parties seek expedited action by the Board decision in Port Authority of New York and New in STB Finance Docket No. 34909 to permit rail (Volume 65, Number 70; Pages 19477– Jersey—Petition for Declaratory Order, STB Finance operations to commence by that date, and have 78). The Privacy Act Statement may also Docket No. 34428, finding that the construction by included a proposed procedural schedule to be found at http://dms.dot.gov. the Port Authority and NYCEDC of the connector accomplish that goal. VerDate Aug<31>2005 14:57 Aug 24, 2006 Jkt 208001 PO 00000 Frm 00117 Fmt 4703 Sfmt 4703 E:\FR\FM\25AUN1.SGM 25AUN1 cprice-sewell on PROD1PC66 with NOTICES 50500 Federal Register / Vol. 71, No. 165 / Friday, August 25, 2006 / Notices line and is satisfied with the physical so in the North Jersey Shared Asset east of Arlington Yard, Richmond condition of the line, including, but not Area. County, NY, and milepost 7.4, via the limited to, all signals and This notice will be served on the Chemical Coast Connector, at the appurtenances, and the appropriate and Association of American Railroads (Car proposed point of switch at the necessary crews of the parties have been Service Division) as agent for all connection between the Chemical Coast qualified to operate the line; and (2) the railroads subscribing to the car-service Connector and Conrail’s Chemical Coast U.S. Coast Guard regulations and and car-hire agreement: Association of Line in Union County, NJ, a distance of requirements with respect to the American Railroads, 50 F Street, NW., 2.8 miles, and (b) the Travis Branch maintenance and operation of the Washington, DC 20001; and on the between milepost 0.00 Arlington Yard Arthur Kill Lift Bridge are acceptable to American Short Line and Regional Station and milepost 4.41 in Richmond Conrail. Railroad Association: American Short County, a distance of 4.41 miles. The parties state that there are three Line and Regional Railroad Association, Included within the North Shore Line primary traffic flows anticipated over 50 F Street, NW., Suite 7020, segment are all tracks in Arlington Yard the line: (1) Intermodal traffic moving in Washington, DC 20001. together with lead tracks on both the blocks assembled by the Howland Hook Board decisions and notices are east and west ends of the yard, the so- Marine Terminal/Port Ivory carrier available on our Web site at http:// called Wye Connector, that provides a moving to and from Arlington Yard www.stb.dot.gov.
Recommended publications
  • NYMTC Regional Freight Plan

    NYMTC Regional Freight Plan

    3-1 CHAPTER 3: THE THE TRANSPORTATION SYSTEM Photo Source: NYMTC Photo Source: 5. Implementation Guidance 3. Identifying & Assessing Needs 4. Improvements & Solutions 1. Regional Freight Plan Purpose & Desired Freight Outcomes 2. Freight System & Market Overview Regional Freight Plan 2018-2045 Appendix 8 | Regional Freight Plan 2018-2045 Table of Contents 1.0 Regional Freight Plan Purpose and Desired Freight Outcomes ................................................... 1-1 1.1 Plan 2045 Shared Goals and Desired Freight Outcomes ......................................................... 1-2 1.2 Institutional Context ................................................................................................................... 1-1 1.3 Regional Context ....................................................................................................................... 1-2 1.4 Required Federal Performance Measures................................................................................. 1-4 2.0 Freight System and Market Overview .............................................................................................. 2-1 2.1 Freight System Description and Operating Characteristics ....................................................... 2-1 2.1.1 Roadway Network ......................................................................................................... 2-1 2.1.2 Rail Network .................................................................................................................. 2-8 2.1.3 Waterborne Network
  • Baltimore and Ohio Rail Road

    Baltimore and Ohio Rail Road

    Baltimore and Ohio Rail Road BALTIMORE AND OHIO RAIL ROAD. Spec. law of MD, February 28, 1827 Trackage, June 30, 1918: 2315.039 mi. First main track 774.892 mi. Second and other main tracks 1580.364 mi. Yard track and sidings Equipment Steam locomotives 2,242 Other locomotives 9 Freight cars 88,904 Passenger cars 1,243 Floating equipment 168 Work equipment 2,392 Miscellaneous 10 Equipment, leased Steam locomotives 16 to Baltimore and Ohio Chicago Terminal Steam locomotives 1 to Little Kanawha Railroad Steam locomotives 4 to Long Fork Railway Steam locomotives 1 to Morgantown and Kingwood Steam locomotives 5 to The Sandy Valley & Elkhorn Railway Steam locomotives 6 to The Sharpsville Railroad Steam locomotives 30 to Staten Island Rapid Transit Steam locomotives 158 from Toledo and Cincinnati Freight cars 4 to Long Fork Railway Freight cars 5 to The Sandy Valley & Elkhorn Railway Freight cars 5,732 from Toledo and Cincinnati Freight cars 976 from Mather Humane Stock Transportation Co. Passenger cars 1 to Baltimore and Ohio Chicago Terminal Passenger cars 3 to Long Fork Railway Passenger cars 4 to The Sandy Valley & Elkhorn Railway Passenger cars 1 to The Sharpsville Railroad Passenger cars 110 from Toledo and Cincinnati Work equipment 2 to The Sandy Valley & Elkhorn Railway Work equipment 57 to Staten Island Rapid Transit Miscellaneous 2 from Toledo and Cincinnati Miscellaneous 1 from Baltimore and Ohio in Pennsylvania Miscellaneous 7 from Baltimore and Ohio Southwestern The Baltimore and Ohio Rail Road controls the following companies:
  • Our First Sale in 15 Years

    Our First Sale in 15 Years

    A WATCHUNG COMMUNICATIONS, INC. PUBLICATION The Westfield Leader and The Scotch Plains – Fanwood TIMES Thursday, July 28, 2005 Page 3 Construction Begins for S.I. 21st District News Cargo Freight to Elizabeth Gang Violence Affects All AREA – Last week, construction tain our status as the busiest seaport New Jersey Citizens was initiated on ExpressRail Staten on the East Coast, we must continue Island, a $26 million ship-to-rail cargo to make this an attractive place to do Assemblyman Jon Bramnick, Westfield transfer facility at the Howland Hook business. We believe our $450 mil- TRENTON — Assemblyman Jon Assemblyman Peter Barnes (Edison, Marine Terminal. As part of a larger lion investment in rail in New York Bramnick (Westfield, R-21), a mem- D-18), on a bipartisan basis to sup- initiative, freight rail service to and and New Jersey will greatly enhance ber of the Law and Public Safety port this new law. Mr. Bramnick be- from Staten Island will be reestab- our ability to handle more cargo.” Committee, has proposed a bill con- lieves the growing problem with gang lished after a 15-year hiatus. Port Authority Vice Chairman cerning criminal street gangs. Bill A- violence affects all of the citizens of When completed in the first quar- Charles Gargano said, “The construc- 4351 would increase the degree of the New Jersey. ter of 2006, the ship-to-rail terminal tion of this rail terminal signals the crime, to the next highest level, if the will be able to handle approximately Port Authority’s commitment to act was committed during a gang Brown Promoted to 100,000 containers a year.
  • 3.5: Freight Movement

    3.5: Freight Movement

    3.5 Freight Movement 3.5 Freight Movement A. INTRODUCTION This section describes the characteristics of the existing rail freight services and railroad operators in the project area. Also addressed is the relationship between those services and Build Alternative long-term operations. The study area contains several rail freight lines and yards that play key roles in the movement of goods to and from the Port of New York and New Jersey, the largest port on the east coast, as well as in the movement of goods vital to businesses and residents in multiple states. However, no long-term freight movement impacts are anticipated with the Build Alternative, and no mitigation measures will be required. B. SERVICE TYPES The following freight rail services are offered in the project area: • Containerized or “inter-modal” consists primarily of containers or Example of Doublestack Train with Maritime truck trailers moved on rail cars. Containers Intermodal rail traffic is considered the fastest growing rail freight market, and is anticipated to grow in the region between 3.9 and 5.6 percent annually through 2030, based on the NJTPA Freight System Performance Study (see Table 3.5-1). • Carload traffic consists of products that are typically moved in boxcars, hopper cars, tank cars, and special lumber cars over a long distance by rail, and then either transported directly by rail or Example of Carload Rail Traffic shifted to truck for delivery to more local customers. The characteristics of these commodities (e.g., bulk, heavy or over- dimensional) make rail the preferred option for long-distance movement.
  • New York City Comprehensive Waterfront Plan

    New York City Comprehensive Waterfront Plan

    NEW YORK CITY CoMPREHENSWE WATERFRONT PLAN Reclaiming the City's Edge For Public Discussion Summer 1992 DAVID N. DINKINS, Mayor City of New lVrk RICHARD L. SCHAFFER, Director Department of City Planning NYC DCP 92-27 NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN CONTENTS EXECUTIVE SUMMA RY 1 INTRODUCTION: SETTING THE COURSE 1 2 PLANNING FRA MEWORK 5 HISTORICAL CONTEXT 5 LEGAL CONTEXT 7 REGULATORY CONTEXT 10 3 THE NATURAL WATERFRONT 17 WATERFRONT RESOURCES AND THEIR SIGNIFICANCE 17 Wetlands 18 Significant Coastal Habitats 21 Beaches and Coastal Erosion Areas 22 Water Quality 26 THE PLAN FOR THE NATURAL WATERFRONT 33 Citywide Strategy 33 Special Natural Waterfront Areas 35 4 THE PUBLIC WATERFRONT 51 THE EXISTING PUBLIC WATERFRONT 52 THE ACCESSIBLE WATERFRONT: ISSUES AND OPPORTUNITIES 63 THE PLAN FOR THE PUBLIC WATERFRONT 70 Regulatory Strategy 70 Public Access Opportunities 71 5 THE WORKING WATERFRONT 83 HISTORY 83 THE WORKING WATERFRONT TODAY 85 WORKING WATERFRONT ISSUES 101 THE PLAN FOR THE WORKING WATERFRONT 106 Designation Significant Maritime and Industrial Areas 107 JFK and LaGuardia Airport Areas 114 Citywide Strategy fo r the Wo rking Waterfront 115 6 THE REDEVELOPING WATER FRONT 119 THE REDEVELOPING WATERFRONT TODAY 119 THE IMPORTANCE OF REDEVELOPMENT 122 WATERFRONT DEVELOPMENT ISSUES 125 REDEVELOPMENT CRITERIA 127 THE PLAN FOR THE REDEVELOPING WATERFRONT 128 7 WATER FRONT ZONING PROPOSAL 145 WATERFRONT AREA 146 ZONING LOTS 147 CALCULATING FLOOR AREA ON WATERFRONTAGE loTS 148 DEFINITION OF WATER DEPENDENT & WATERFRONT ENHANCING USES
  • Dear Chair White and Director Higgins: Thank You for the Opportunity To

    Dear Chair White and Director Higgins: Thank You for the Opportunity To

    May 05, 2015 Mary Jo White Chair, Securities and Exchange Commission Keith Higgins Director, Corporate Finance Division, Securities and Exchange Commission Securities and Exchange Commission 100 F Street, NE Washington, DC 20549 Re: Disclosure Effectiveness Review Dear Chair White and Director Higgins: Thank you for the opportunity to provide input on improving disclosures by U.S. public companies. I am writing to you on behalf the Union of Concerned Scientists (UCS). UCS is a leading science based non-profit working to integrate science into public decision making. In particular, I write to urge the Securities and Exchange Commission to proceed with rulemaking on two issues, as a means of improving disclosure for investors and the public: 1) require companies to report annually whether climate change impacts pose risks to their business and to clearly specify any such risks, and 2) require publicly traded companies to disclose both their direct and indirect political activities. These actions would provide important information to investors and the public about the risks companies face and how companies are influencing important policy discussions. Disclosing Risks Posed by Climate Change The SEC recognized the financial impacts of climate change when it issued Interpretive Guidance on climate disclosure in February 2010, responding to more than 100 institutional investors representing $7 trillion who are seeking regular reporting from companies on these risks1. The Guidance outlines expectations for companies reporting on material regulatory, physical, and indirect risks, as well as opportunities related to climate change including: “Significant physical effects of climate change, such as effects on the severity of weather (for example, floods or hurricanes), sea levels, the arability of farmland, and water availability and quality, have the potential to affect a registrant’s operations and results.
  • New Jersey Statewide FREIGHT PLAN %FDFNCFS

    New Jersey Statewide FREIGHT PLAN %FDFNCFS

    New Jersey Statewide FREIGHT PLAN %FDFNCFS Table of CONTENTS Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the Author(s) and do not necessarily reflect the view of the Federal Highway Administration. New Jersey Statewide FREIGHT PLAN Page left blank intentionally. Table of CONTENTS Acknowledgements The New Jersey Department of Transportation’s Division of Multimodal Services thanks the many organizations and individuals for their time and contribution in making this document possible. New Jersey Department of Transportation Nicole Minutoli Paul Truban Genevieve Clifton Himanshu Patel Andrew Ludasi New Jersey Freight Advisory Committee Calvin Edghill, FHWA Keith Skilton, FHWA Anne Strauss-Wieder, NJTPA Jakub Rowinski, NJTPA Ted Dahlburg, DVRPC Mike Ruane, DVRPC Bill Schiavi, SJTPO David Heller, SJTPO Steve Brown, PANYNJ Victoria Farr, PANYNJ Stephanie Molden, PANYNJ Alan Kearns, NJ TRANSIT Steve Mazur, SJTA Rodney Oglesby, CSX Rick Crawford, Norfolk Southern Michael Fesen, Norfolk Southern Jocelyn Hill, Conrail Adam Baginski, Conrail Kelvin MacKavanagh, New Jersey Short Line Railroad Association Brian Hare, Pennsylvania Department of Transportation David Rosenberg, New York State Department of Transportation Consultant Team Jennifer Grenier, WSP Stephen Chiaramonte, WSP Alan Meyers, WSP Carlos Bastida, WSP Joseph Bryan, WSP Sebastian Guerrero, WSP Debbie Hartman, WSP Ruchi Shrivastava, WSP Reed Sibley, WSP Scudder Smith, WSP Scott Parker, Jacobs Engineering Jayne Yost, Jacobs Engineering
  • About Fresh Kills

    About Fresh Kills

    INTERNATIONAL DESIGN COMPETITION : 2001 ABOUT FRESH KILLS Fresh Kills Landfill is located on the western shore of Staten Island. Approximately half the 2,200-acre landfill is composed of four mounds, or sections, identified as 1/9, 2/8, 3/4 and 6/7 which range in height from 90 feet to approximately 225 feet. These mounds are the result of more than 50 years of landfilling, primarily household waste. Two of the four mounds are fully capped and closed; the other two are being prepared for final capping and closure. Fresh Kills is a highly engineered site, with numerous systems put in place to protect public health and environmental safety. However, roughly half the site has never been filled with garbage or was filled more than twenty years ago. These flatter areas and open waterways host everything from landfill infrastructure and roadways to intact wetlands and wildlife habitats. The potential exists for these areas, and eventually, the mounds themselves, to support broader and more active uses. With effective preparation now, the city can, over time, transform this controversial site into an important asset for Staten Island, the city and the region. Before dumping began, Fresh Kills Landfill was much like the rest of northwest Staten Island. That is, most of the landfill was a salt or intertidal marsh. The topography was low-lying, with a subsoil of clay and soils of sand and silt. The remainder of the area was originally farmland, either actively farmed, or abandoned and in stages of succession. Although Fresh Kills Landfill is not a wholly natural environment, the site has developed its own unique ecology.
  • Westfield Memorial Library 550 E Broad Si Westfield Mj 07090-2116

    Westfield Memorial Library 550 E Broad Si Westfield Mj 07090-2116

    Si3 PI •«*****«**CAR-RT L0T**C015 I 3 WESTFIELD MEMORIAL LIBRARY 550 E BROAD SI WESTFIELD MJ 07090-2116 07090211650 96 {topulos. flan 9t*tu*. fVrbtmmui rsMaarS ISO rswiae, Stan Siftwwfcir V law OUR 115th YEAR - ISSUE NO. 30-2005 I SPS 6*0020 Thursday. July 28, 2005 (908) 232-1407 Periodical - Postal Paid at Westfield, N J. www.gotradtr.coni pna8@Koleader.rom SIXTY CENTS Hearing Begins For Police Officer With an Unusual Public Forum By PAUL J. PEYTON for 11 a.m. on Wednesday, August 17. Chambers. Specialty Written /ttr The WetlfielJ leader The hearing was made public at the The police department’s case was WESTFIELD - In an unusual pub­ insistence of Detective Chambers, presented by James Plosia, Jr. of the lic forum, the Westfield Police De­ which is within her rights according law firm of Apruzzese, McDermott, partment began its disciplinary hear­ to written procedures for departmen­ Mastro & Murphy of Liberty Comer, ing last Thursday at noon against tal disciplinary hearings. Detective which represents the town in labor Detective Sandra Chambers, suppos­ Chambers was the first woman hired matters. edly charged with fixing a $20 park­ by the department when she joined Attorney Hassan Abdellah of Eliza­ ing ticket and covering up the matter. the force in 1995. beth represented Detective Cham­ Detective Chambers has been sus­ Held in the Community Room of bers. pended with pay since March. Dur­ the municipal building, approxi­ James Damato, a Morris County attorney, conducted the hearing. He said his role was, “to determine what the facts are and to listen to all of the evidence.” His recommendations are non-binding.
  • Transportation Trips, Excursions, Special Journeys, Outings, Tours, and Milestones In, To, from Or Through New Jersey

    Transportation Trips, Excursions, Special Journeys, Outings, Tours, and Milestones In, To, from Or Through New Jersey

    TRANSPORTATION TRIPS, EXCURSIONS, SPECIAL JOURNEYS, OUTINGS, TOURS, AND MILESTONES IN, TO, FROM OR THROUGH NEW JERSEY Bill McKelvey, Editor, Updated to Mon., Mar. 8, 2021 INTRODUCTION This is a reference work which we hope will be useful to historians and researchers. For those researchers wanting to do a deeper dive into the history of a particular event or series of events, copious resources are given for most of the fantrips, excursions, special moves, etc. in this compilation. You may find it much easier to search for the RR, event, city, etc. you are interested in than to read the entire document. We also think it will provide interesting, educational, and sometimes entertaining reading. Perhaps it will give ideas to future fantrip or excursion leaders for trips which may still be possible. In any such work like this there is always the question of what to include or exclude or where to draw the line. Our first thought was to limit this work to railfan excursions, but that soon got broadened to include rail specials for the general public and officials, special moves, trolley trips, bus outings, waterway and canal journeys, etc. The focus has been on such trips which operated within NJ; from NJ; into NJ from other states; or, passed through NJ. We have excluded regularly scheduled tourist type rides, automobile journeys, air trips, amusement park rides, etc. NOTE: Since many of the following items were taken from promotional literature we can not guarantee that each and every trip was actually operated. Early on the railways explored and promoted special journeys for the public as a way to improve their bottom line.
  • Staten Island Railway Railway Timetable

    Staten Island Railway Railway Timetable

    Effective Winter 2016 – 2017 MTA Staten Island Railway Railway Timetable ✪ NEW: ARTHUR KILL STATION MetroCard® may be purchased at vending machines located at St George terminal and at Tompkinsville station, and is accepted for both entering and leaving the railway at both locations as well. Now more than ever – MTA Staten Island Railway for speed and reliability Reduced-Fare Benefits – If you qualify for reduced fare, you can travel for half fare. You are eligible for reduced-fare benefit if you are at least 65 years of age or have a qualifying disability with proper identification. Benefits are available (except on peak-hour express buses) with proper identification, including Reduced-Fare MetroCard or Medicare card (Medicaid cards do not qualify). Children – The subway, SIR, local, Limited-Stop, and +SelectBusService buses permit up to three children, 44 inches tall and under, to ride free when accompanied by an adult paying full-fare. Express buses permit one child, two years old and under, to ride free when carried in the lap of a fare-paying adult. Holiday Service – On Martin Luther King Day, Columbus Day, Veterans Day, Election Day, and the Day after Thanksgiving, SIR operates a Weekday Schedule. When New Years Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day are celebrated Tuesday through Friday, SIR operates a Saturday Schedule; however, if these holidays are celebrated on Saturday, Sunday or Monday, SIR operates a Sunday Schedule. SIR will operate early departure “get-a-way” schedules on the evening before select holidays. Please refer to Service Information posters for details.
  • Staten Island Railway, a Unit of the Metropolitan Transportation Authority, for the Period January 1, 2014 to September 12, 2017

    Staten Island Railway, a Unit of the Metropolitan Transportation Authority, for the Period January 1, 2014 to September 12, 2017

    April 12, 2018 Mr. Joseph Lhota Chairman Metropolitan Transportation Authority 2 Broadway New York, NY 10004 Re: Selected Safety and Security Equipment at Train Stations Report 2017-S-84 Dear Mr. Lhota: Pursuant to the State Comptroller’s authority as set forth in Article X, Section 5 of the State Constitution and Section 2803 of the Public Authorities Law, we examined selected safety and security equipment at train stations at the Staten Island Railway, a unit of the Metropolitan Transportation Authority, for the period January 1, 2014 to September 12, 2017. The objective of our audit was to determine whether the Staten Island Railway has taken appropriate action to ensure that equipment, such as cameras and Customer Assistance Intercoms, are working, tested, maintained, and monitored. Background Staten Island Railway (SIR) is a subsidiary of the Metropolitan Transportation Authority (MTA). Administratively, SIR is a separate operating unit, reporting to New York City Transit’s (Transit) Department of Subways. SIR operates a single rapid transit line that runs the length of Staten Island (about 14 miles) from St. George Terminal to the southern terminal at Tottenville. SIR’s management oversees capital projects at its 21 train stations, maintains the stations’ structural components, and ensures that security equipment installed at the stations is working, monitored, and tested. As of June 8, 2017, SIR had 199 Closed Circuit Television (CCTV) cameras, 42 stand-alone cameras, and 43 Customer Assistance Intercoms (CAI) – intended for customer use in emergencies – at an estimated cost of approximately $21 million for the new system, excluding the stand-alone cameras.