FPGA Emulation for Critical-Path Coverage Analysis
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
EMBEDDED PROGRAMMABLE LOGIC CORES By
IMPLEMENTATION CONSIDERATIONS FOR “SOFT” EMBEDDED PROGRAMMABLE LOGIC CORES by James Cheng-Huan Wu B.A.Sc., University of British Columbia, 2002 A thesis submitted in partial fulfillment of the requirements for the degree of Master of Applied Science in The Faculty of Graduate Studies Department of Electrical and Computer Engineering We accept this thesis as conforming to the required standard: ___________________________ ___________________________ ___________________________ ___________________________ The University of British Columbia September 2004 © James C.H. Wu, 2004 ABSTRACT IMPLEMENTATION CONSIDERATIONS FOR “SOFT” EMBEDDED PROGRAMMABLE LOGIC CORES As integrated circuits become increasingly more complex and expensive, the ability to make post-fabrication changes will become much more attractive. This ability can be realized using programmable logic cores. Currently, such cores are available from vendors in the form of “hard” macro layouts. An alternative approach for fine-grain programmability is possible: vendors supply an RTL version of their programmable logic fabric that can be synthesized using standard cells. Although this technique may suffer in terms of speed, density, and power overhead, the task of integrating such cores is far easier than the task of integrating “hard” cores into an ASIC or SoC. When the required amount of programmable logic is small, this ease of use may be more important than the increased overhead. In this thesis, we identify potential implementation issues associated with such cores, and investigate in depth the area, speed and power overhead of using this approach. Based on this investigation, we attempt to improve the performance of programmable cores created in this manner. Using a test-chip implementation, we identify three main issues: core size selection, I/O connections, and clock-tree synthesis. -
Common Path Pessimism Removal in Static Timing Analysis
Scholars' Mine Masters Theses Student Theses and Dissertations Summer 2015 Common path pessimism removal in static timing analysis Chunyu Wang Follow this and additional works at: https://scholarsmine.mst.edu/masters_theses Part of the Computer Engineering Commons Department: Recommended Citation Wang, Chunyu, "Common path pessimism removal in static timing analysis" (2015). Masters Theses. 7440. https://scholarsmine.mst.edu/masters_theses/7440 This thesis is brought to you by Scholars' Mine, a service of the Missouri S&T Library and Learning Resources. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact scholarsmine@mst.edu. COMMON PATH PESSIMISM REMOVAL IN STATIC TIMING ANALYSIS by CHUNYU WANG A THESIS Presented to the Faculty of the Graduate School of the MISSOURI UNIVERSITY OF SCIENCE AND TECHNOLOGY In Partial Fulfillment of the Requirements for the Degree MASTER OF SCIENCE IN COMPUTER ENGINEERING 2015 Approved by Yiyu Shi, Advisor Minsu Choi Jun Fan 2015 Chunyu Wang All Rights Reserved iii ABSTRACT Static timing analysis is a key process to guarantee timing closure for modern IC designs. However, additional pessimism can significantly increase the difficulty to achieve timing closure. Common path pessimism removal (CPPR) is a prevalent step to achieve accurate timing signoff. To speed up the existing exhaustive exploration on all paths in a design, this thesis introduces a fast multi-threading timing analysis for removing common path pessimism based on block-based static timing analysis. Experimental results show that the proposed method has faster runtime in removing excess pessimism from clock paths. -
Fast and Flexible CAD for Fpgas and Timing Analysis by Kevin Edward
Fast and Flexible CAD for FPGAs and Timing Analysis by Kevin Edward Murray A thesis submitted in conformity with the requirements for the degree of Doctor of Philosophy Graduate Department of Electrical and Computer Engineering University of Toronto © Copyright 2020 by Kevin Edward Murray Abstract Fast and Flexible CAD for FPGAs and Timing Analysis Kevin Edward Murray Doctor of Philosophy Graduate Department of Electrical and Computer Engineering University of Toronto 2020 Field Programmable Gate Arrays (FPGAs) are a widely used platform for hardware acceleration and digital systems design, which offer high performance and power efficiency while remaining re- programmable. However a major challenge to using FPGAs is the complex Computer Aided Design (CAD) flow required to program them, which makes FPGAs difficult and time-consuming to use. This thesis investigates techniques to address these challenges. A key component of the CAD flow is timing analysis, which is used to verify correctness and drive optimizations. Since the dominant form of timing analysis, Static Timing Analysis (STA), is time consuming to perform, we investigate methods to efficiently perform STA in parallel. We then develop Extended Static Timing Analysis (ESTA), which performs a more detailed and less pessimistic form of timing analysis by accounting for the probability of signal transitions. We next study a variety of enhancements to the FPGA physical design flow, including to key optimization stages like packing, placement and routing. These techniques are combined in the open- source VTR 8 design flow, and significantly outperform previous methods. We also develop advanced architecture modelling capabilities which allow VTR 8 to target a wider range of FPGA architectures. -
Gate-Level Timing Analysis and Waveform Evaluation
Syracuse University SURFACE Dissertations - ALL SURFACE May 2015 Gate-level timing analysis and waveform evaluation Chaobo Li Syracuse University Follow this and additional works at: https://surface.syr.edu/etd Part of the Engineering Commons Recommended Citation Li, Chaobo, "Gate-level timing analysis and waveform evaluation" (2015). Dissertations - ALL. 220. https://surface.syr.edu/etd/220 This Dissertation is brought to you for free and open access by the SURFACE at SURFACE. It has been accepted for inclusion in Dissertations - ALL by an authorized administrator of SURFACE. For more information, please contact surface@syr.edu. Abstract Static timing analysis (STA) is an integral part of modern VLSI chip design. Table lookup based methods are widely used in current industry due to its fast runtime and mature algorithms. Conventional STA algorithms based on table-lookup methods are developed under many assumptions in timing analysis; however, most of those assumptions, such as that input signals and output signals can be accurately modeled as ramp waveforms, are no longer satisfactory to meet the increasing demand of accuracy for new technologies. In this dissertation, we discuss several crucial issues that conventional STA has not taken into consideration, and propose new methods to handle these issues and show that new methods produce accurate results. In logic circuits, gates may have multiple inputs and signals can arrive at these inputs at different times and with different waveforms. Different arrival times and waveforms of signals can cause very different responses. However, multiple-input transition effects are totally overlooked by current STA tools. Using a conventional single-input transition model when multiple-input transition happens can cause significant estimation errors in timing analysis. -
Manoel Barros Marin BE-BI-BP ISOTDAQ 2019 @ Royal Holloway, University of London (UK) 09/04/2019
ISOTDAQ 2019 @ Royal Holloway, University of London (UK) 09/04/2019 Manoel Barros Marin BE-BI-BP ISOTDAQ 2019 @ Royal Holloway, University of London (UK) 09/04/2019 Outline: • … from the previous lesson • Key concepts about FPGA design • FPGA gateware design work flow • Summary Manoel Barros Marin BE-BI-BP ISOTDAQ 2019 @ Royal Holloway, University of London (UK) 09/04/2019 • … from the previous lesson Manoel Barros Marin BE-BI-BP … from the previous lesson What is an Field Programmable Gate Array (FPGA)? 4 … from the previous lesson What is an Field Programmable Gate Array (FPGA)? FPGA - Wikipedia https://en.wikipedia.org/wiki/Field-programmable_gate_array A field-programmable gate array (FPGA) is an integrated circuit designed to be configured by a customer or a designer after manufacturing – hence "field-programmable". 5 … from the previous lesson What is an Field Programmable Gate Array (FPGA)? FPGA - Wikipedia https://en.wikipedia.org/wiki/Field-programmable_gate_array A field-programmable gate array (FPGA) is an integrated circuit designed to be configured by a customer or a designer after manufacturing – hence "field-programmable". 6 … from the previous lesson • FPGA fabric (matrix like structure) made of: • I/O-cells to communicate with outside world • Logic cells o Look-Up-Table (LUT) to implement combinatorial logic o Flip-Flops (D) to implement sequential logic • Interconnect network between logic resources • Clock tree to distribute the clock signals 7 … from the previous lesson • But it also features Hard Blocks: Example of -
Chapter 8 Timing Closure
Chapter 8 8 Timing Closure 8 Timing Closure ............................................................221 8.1 Introduction..................................................................................... 221 8.2 Timing Analysis and Performance Constraints ............................. 223 8.2.1 Static Timing Analysis................................................... 224 8.2.2 Delay Budgeting with the Zero-Slack Algorithm........... 229 8.3 Timing-Driven Placement............................................................... 233 8.3.1 Net-Based Techniques ................................................. 234 8.3.2 Embedding STA into Linear Programs for Placement . 237 8.4 Timing-Driven Routing ................................................................... 239 8 8.4.1 The Bounded-Radius, Bounded-Cost Algorithm.......... 240 8.4.2 Prim-Dijkstra Tradeoff................................................... 241 8.4.3 Minimization of Source-to-Sink Delay........................... 242 8.5 Physical Synthesis ......................................................................... 244 8.5.1 Gate Sizing.................................................................... 244 8.5.2 Buffering........................................................................ 245 8.5.3 Netlist Restructuring...................................................... 246 8.6 Performance-Driven Design Flow.................................................. 250 8.7 Conclusions................................................................................... -
Timing Closure
Timing Closure Introduction Every design has to run at a certain speed based on the design requirement. There are generally three types of speed requirement in an FPGA design: Timing requirement – how fast or slow a design should run. This is defined through the target clock period (or clock frequency) and a few other constraints. Throughput – the average rate of the valid output delivered per clock cycle Latency – the amount of the time required when the valid output is available after the input arrives, usually measured in the number of clock cycles Throughput and latency are usually related to the design architecture and application, and they need to be traded off between each other based on the system requirement. For example, high throughput usually means more pipelining, which increases the latency; low latency usually requires longer combinatorial paths, which removes pipelines, and this can reduce the throughput and clock speed. More often, FPGA designers deal with the timing requirement to make sure that the design runs at the required clock speed. This can require hard work for high-speed design in order to close timing using various techniques (including the trade-off between throughput and latency, appropriate timing constraint adjustments, etc.) and running through multiple processing iterations including Synthesis, MAP and PAR. This document focuses on the timing requirement; it explains the timing- driven FPGA implementation processes and shows how to tackle timing issues when timing closure becomes problematic. Copyright © October 2013 Lattice Semiconductor Corporation. Introduction Timing Requirements and Constraints Several types of timing requirement are commonly used in FPGA designs and can be specified in Diamond through constraints and preferences. -
Aadam: a Fast, Accurate, and Versatile Aging-Aware Cell Library Delay Model Using Feed-Forward Neural Network
Aadam: A Fast, Accurate, and Versatile Aging-Aware Cell Library Delay Model using Feed-Forward Neural Network Seyed Milad Ebrahimipour1, Behnam Ghavami2, Hamid Mousavi1, Mohsen Raji3 Zhenman Fang2, Lesley Shannon2 1Shahid Bahonar University of Kerman, {miladebrahimi, hamidmousavi0}@eng.uk.ac.ir 2Simon Fraser University, {behnam_ghavami, zhenman, lesley_shannon}@sfu.ca 3Shiraz University, raji@shirazu.ac.ir ABSTRACT 1 INTRODUCTION With the CMOS technology scaling, transistor aging has become With the CMOS technology scaling, the reliability of circuits has one major issue affecting circuit reliability and lifetime. There are become one of the major issues affecting digital circuit designs1 [ , 7]. two major classes of existing studies that model the aging effects In addition to the correct functionality of the circuit, a longtime in the circuit delay. One is at transistor-level, which is highly ac- lifespan is also crucial in many application fields such as aerospace, curate but very slow. The other is at gate-level, which is faster but defense, and medical industries [5, 13]. Transistor aging is a key less accurate. Moreover, most prior studies only consider a limited source of failure that threatens the lifetime reliability of digital subset or limited value ranges of aging factors. circuits. It leads to a degradation of the electrical characteristics of In this paper, we propose Aadam, a fast, accurate, and versatile transistors and subsequently, a considerable increase of the device aging-aware delay model for generic cell libraries. In Aadam, we delay [19]. For example, the Negative Bias Temperature Instability first use transistor-level SPICE simulations to accurately charac- (NBTI) aging phenomenon, a major parametric reliability issue, terize the delay degradation of each library cell under a versatile may increase the circuit delay by up to 30% [14].