Household Fuel and Energy Use for Rural Development
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
FINAL REPORT.Pdf
Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report MUNICIPALITY PROFILE Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Table of Content Contents Page No. CHAPTER - I ..................................................................................................................................................... 1 1.1 NAMING AND ORIGIN............................................................................................................................ 1 1.2 LOCATION.............................................................................................................................................. 1 1.3 SETTLEMENTS AND ADMINISTRATIVE UNITS ......................................................................................... 3 CHAPTER - II.................................................................................................................................................... 4 2.1 PHYSIOGRAPHY......................................................................................................................................4 2.2 GEOLOGY/GEOMORPHOLOGY -
Nepal Orthodox Tea: Analysis of Industry, Production, and Market Potential
Nepal Orthodox Tea: Analysis of industry, production, and market potential By Rudra Bahadur Baral M.S., University of Hohenheim, Germany, 2008 A THESIS submitted in partial fulfillment of the requirements for the degree MASTER OF SCIENCE Department of Agricultural Economics Collage of Agriculture KANSAS STATE UNIVERSITY Manhattan, Kansas 2019 Approved by: Major Professor Dr. Aleksan Shanoyan Copyright © Rudra Baral 2019. Abstract This study covers industry analysis, financial analysis and market analysis of Nepal orthodox tea. It aims to evaluate the industry forces, analyze the financial performance of firms, and assess market potential. The study is based on field survey, key informants’ interviews, and participant observation in combination with data from secondary sources. The financial information of 65 tea processing firms was collected using standard financial formats. The production and trade related statistical data were obtained from National Tea and Coffee Development Board Nepal, Trade and Export Promotion Center Nepal, FAOSTAT, International Trade Center and STATISTA. The results of industry analysis indicate that in general, tea processors have low bargaining power against input suppliers and tea buyers. The processing industry was found to be less attractive for new entrants. The threat of substitutes was found to be low. But there is intense internal competition among processing firms for resources and markets. Limited and inefficient production, low economies of scale, unorganized supply chain system, limited access to global market are the major binding constraints identified by this study. The results of the financial analysis found positive returns of investment and increasing returns to scale. However, the average capacity utilization of the processing firms is found to be 33 percent. -
35173-015: Urban Water Supply and Sanitation (Sector) Project
Initial Environmental Examination Document Stage: Updated Project No. 35173-015 April 2020 NEP: Urban Water Supply and Sanitation (Sector) Project – Ilam Water Supply and Sanitation Project, Ilam District Package No: W-05 Prepared by the Ministry of Water Supply, Government of Nepal for the Asian Development Bank. This updated initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the "terms of use" section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgements as to the legal or other status of any territory or area. IEE Report of Ilam WSSP ABBREVIATIONS 2nd STWSSSP Second Small Towns’ Water Supply and Sanitation Sector Project A.D. Anno Domini ADB Asian Development Bank AIFC Average Incremental Financial Cost AM Accountability Mechanism AP Affected Person ATP Ability To Pay BDS Bulk Distribution System BoQ Bill of Quantities B.S. Bikram Sambat BWF Barbed Wire Fencing CAPP Community and Public Participation C-EMP Contractor’s Environmental Management Plan CFUG Community Forest User’s Group CITES Convention on International Trade in Endangered Species of Wild Fauna & Flora CLBW Chain Link Boundary Wall Coliform P/A Coliform Presence/Absence CSA Concerned -
Master Plan of Agricultural Marketing in Eastern Development Region of Nepal
MASTER PLAN OF AGRICULTURAL MARKETING IN EASTERN DEVELOPMENT REGION OF NEPAL Final Report Submitted To Government of Nepal Ministry of Agricultural Development Department of Agriculture Agri. Business Promotion & Marketing Development Directorate (ABPMDD) Harihar Bhawan, Lalitpur Submitted By: Business Promotion Research and Communication Pvt. Ltd., (BPRC) Putalisadak, Kathmandu, Nepal Tel # 0977-01-4442853/4436617, Fax # 0977-01-4436617 Post Box # 19006, Email # bprc@mail.com.np July 2017 (Ashad, 2074) Preface BPRC is pleased to undertake this Study "Master Plan of Agri-Marketing in Eastern Development Region of Nepal". BPRC expresses its gratitude to Agri Business Promotion and Marketing Development Directorate (ABPMDD) to having entrusted this important task. It also expresses gratitude to Mr. Laxman Prasad Paudel, Program Director and his team for expert guidance and for providing suggestions throughout the study period and report writing. BPRC is also thankful to ABDMDD team for their valuable, constructive comments and suggestions which were provided during Inception report and draft report presentations. We also express graduate to Senior Agriculture Marketing Officers Mr. Rajendra Prasad Pradhan and Mr. Puspa Raj Shahi for providing necessary instructions during final report preparation. BPRC acknowledges with gratitude the contribution made by study team of the project, with their valuable contribution the project was successfully brought to its conclusion. BPRC is most grateful to Mrs. Naina Dhakal, Team Leader for the successful execution of this project and for steering the whole tasks of conducting field study till its conclusion. In addition, BPRC conveys its appreciation to the contribution made by Chief and SMS of District Agriculture Development Offices, Agro-Vets, Traders, Wholesalers, Representative of District Development Committee, Member of Market Management Committee, Commercial Farmers Representatives and Agri-Cooperatives etc. -
40554-022: I.Na.Pa.-Dudhang-Soyang-Naya
Resettlement Planning Document Resettlement Plan Grant Number: 0093 May 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Project I.Na.Pa.-Dudhang-Soyang-Naya Bazaar Sub-Project 7 KM Section, Ilam (From chaniage 0+000 to 7+120) Prepared by the Government of Nepal for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Government of Nepal Ministry of Local Development Department of Local Infrastructure Development & Agricultural Roads District Development Committee/District Project Office Ilam Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP) Short Resettlement Plan of I.Na.Pa. - Dudhang- Soyang- Naya Bazaar Sub-Project 7 KM Section (From chainage 0+000 to 7+120) May 2010 i Abbreviation: ADB Asian Development Bank APs Affected People CDC Compensation Determination Committee CDO Chief District Officer CISC Central Implementation Support Consultant DDC District Development Committee DIST District Implementation Support Team DPO District Project Office -
Urban Water Supply and Sanitation (Sector) Project: Ilam Water Supply
Initial Environmental Examination Document Stage: Draft Project Number: 35173-015 July 2018 NEP: Urban Water Supply and Sanitation (Sector) Project – Ilam Water Supply and Sanitation Subproject Package No. W-05 Prepared by the Ministry of Water Supply, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 2 July 2018) Currency unit - Nepalese rupee (NRe) $1.00 = NRs109.821 NRe1.00 = $ 0.009 ABBREVIATIONS ADB – Asian Development Bank BDS – Bulk Distribution System CSA – concerned sector agency DMA – district metered area DPH – dosing pump house DSMC – design, supervision and management consultant DRTAC – design review and technical audit consultant DWSS – Department of Water Supply and Sewerage EARF – environmental assessment and review framework EIA – environmental impact assessment EMP – environmental management plan EMR – environmental monitoring report EPA – Environment Protection Act EPR – Environment Protection Rules, 2054 (1997) (and amendments) ESS – environmental safeguard specialist ESA – environmental safeguard assistant GRC – grievance redress committee GRM – grievance redress mechanism ICG – implementation core group IEE – initial environmental examination NDWQS – National Drinking Water Quality Standard O&M – operation and maintenance PMO – project management office RCC – reinforce cement concrete RPMO – regional project management office ROW – Right-of-way REA – rapid environmental assessment RVT – reservoir tank SEAM-N – Strengthening of Environmental Administration and Management at the Local -
Ÿþm I C R O S O F T W O R
Preparation of District Environment Profile – Ilam Final Report PART I Situation Profile 1.1 Introduction Ilam is one of the easternmost districts lying in the Mechi zone in the Eastern Development Region (EDR) of Nepal. It shares its eastern border with the Darjeeling district of West Bangal state of India. To the north lies Panchthar district, to the south Morang district and Jhapa district of Mechi zone. It extends from 26040’N to 27008’N parallels of latitude and from 87040’ to 88010’ east meridians of longitude in global position. The total area of the district is 1703 sq. km. with 50 km from the east to the west extension and 38kmfrom to the north to the south. Mechi highway passes through the Ilam district headquarter. It crosses this district from south Jhapa border to northwest border (Ranke) with Panchthar district. This highway connects this district with strtgic road net work (SRN). Similarly, it joins this district toward north with Panchthar and further north with Taplejung district. It is divided into 45 VDCs, two municipalities. Those are divided into 11 Ilakas and three electoral constituencies.The headquarter of Ilam district is in Ilam municipality GIS Map 1.1: Location Map of Ilam District Eco TRANS Consult and Shrestha Consultant (Pvt.) Ltd. (JV) Page | 1 Preparation of District Environment Profile – Ilam Final Report GIS Map 1.2: Administrative Division of Ilam district Eco TRANS Consult and Shrestha Consultant (Pvt.) Ltd. (JV) Page | 2 Preparation of District Environment Profile – Ilam Final Report 1.1.1 General Background Different infrastructural, socio-cultural or the economic development activities are being conducted at the high pace within Ilam district. -
Cover Nepal Ginger Profile
NEPAL GINGER PROFILE 2016 SAMARTH Nepal Market Development Programme ACKNOWLEDGEMENTS Nepal Ginger Profile 2016, has been developed in joint collaboration between Samarth-NMDP and Nepal Ginger Producers and Traders Association (NGPTA). The information in the profile aims to fulfil knowledge gaps on quality parameters of commercially traded Nepalese ginger cultivars. The data on the quality parameters will help the traders, processors and policy makers in making informed trade and marketing decisions and in accessing higher value markets. Firstly, we would like to extend our sincere gratitude to Dr. Buddhi Prakash Sharma Adhikari, the principle researcher of the study. His long standing experience was demonstrative in the planning and meticulous execution of the activities engaging multiple stakeholders from the twenty major ginger producing districts of Nepal. We would also like to recognize National Ginger Research Programme’s (NGRP) contribution in sample preparation and physical analysis of the cultivars. Finally, the initiative would not have been possible without sincere efforts and contribution from District Agriculture Development Offices (DADOs), farmers, traders, cooperatives and the technical expertise from various agencies, for which we are very grateful. MESSAGE FROM SECRETARY OF MoAD Ginger is an important spice crop extensively grown in the mid-hills of Nepal. Nepal is the third largest producer of ginger in the world, trailing behind China and India. Despite being one of the exportable commodities and a promising source of income for smallholder farmers, many constraints needs to be addressed for the Nepalese ginger to remain competitive in the international market. Some of these constraints include limited access to improved seeds, new technologies and market opportunities. -
Resource Mapping of Suryodaya Municipality
Resource Mapping of Suryodaya Municipality Table of Contents ACKNOWLEDGEMENT ABBREVATIONS TABLE OF CONTENTS CHAPTER 1: INTRODUCTION ......................................................................... 1 1.1 BACKGROUND ........................................................................................ 1 1.2 OBJECTIVES AND SCOPES .................................................................... 2 1.2.1 Objectives of the work ......................................................................... 2 1.2.2 Scopes of the project ............................................................................ 2 CHAPTER 2: METHODOLOGY ........................................................................ 4 2.1 FIELD WORK PHASE .............................................................................. 4 2.1.1 Desk study and collection of information ............................................ 4 2.1.2 Group Discussion and consultation meeting: ...................................... 4 2.1.3 Data collection: .................................................................................... 5 2.1.4 Data analysis: ....................................................................................... 5 2.1.5 Map Develop ........................................................................................ 5 2.2 REPORT PREPARATION PHASE ........................................................... 5 2.2.1 Inception report writing: ...................................................................... 5 2.2.2 Draft Report presentation:................................................................... -
KANGCHENJUNGA LANDSCAPE NEPAL KANGCHENJUNGA LANDSCAPE NEPAL: from Conservation and Development Perspectives
KANGCHENJUNGA LANDSCAPE NEPAL KANGCHENJUNGA LANDSCAPE NEPAL: KANGCHENJUNGA LANDSCAPE from conservation and development perspectives from conservation and development perspectives RESEARCH CENTRE FOR APPLIED SCIENCE AND TECHNOLOGY (RECAST) TRIBHUVAN UNIVERSITY P.O. Box 1030, Kirtipur, Kathmandu, Nepal Tel: +977-1-4330348 | Fax: +977-1-4331303 Web: www.recast.edu.np KANGCHENJUNGA LANDSCAPE NEPAL from conservation and development perspectives Ram P. Chaudhary Yadav Uprety Surya P. Joshi Krishna K. Shrestha Khadga B. Basnet Govinda Basnet Krishna R. Shrestha Kuber P. Bhatta Krishna P. Acharya Nakul Chettri February 2015 KANGCHENJUNGA LANDSCAPE NEPAL ii from conservation and development perspectives Copyright © Ministry of Forests and Soil Conservation (MoFSC), Government of Nepal Research Centre for Applied Science and Technology (RECAST), Tribhuvan University and International Centre for Integrated Mountain Development (ICIMOD). All rights reserved, Published 2015 All photographs by authors, unless otherwise stated. Photographs Front cover: Kangchenjunga mountain range; Red panda (photo by Sonam Tashi Lama); Asian elephant (photo by Narendra B. Pradhan); A sacred stone in Ilam district Front inside (clockwise from top left): Winged thorn rose, ‘Jangali gulaf’ (Rosa sericea); Indian aconite, ‘Atis’ (Aconitum heterophyllum); Himalayan marsh orchid, ‘Paanch aunle’ (Dactylorhiza hatagirea); Himalayan May apple, ‘Laghu patra’ (Sinopodophyllum hexandrum) Back cover: A waterfall along the way to Olangchung Gola, Taplejung Back inside: Kechana pillar -
List of Payout Agents in Nepal
SN District Payout Agent Branch Address Contact Number 1 Achham Baijanath Computer Trade And Suppliers Siddeshwor, Achham Siddeshwor-1,Sanfebagar,Achham 097-625020 2 Achham Daniel Cosmetic And Photocopy Center Binayak, Achham Binayak-05,Achham 097-500017 3 Achham District Saving And Credit Cooperative Union Mangalsen Mangalsen Achham 097-620213 4 Achham Hatemalo Saving And Credit Coprative Ltd. Binayak Binayak1 Acham 097-410723 5 Achham Janata Bank Limited Achham Mangalsen 097-620317 6 Achham Khemaz Electronic Kuswashi Kuswashi-6,Mangalsen,Achham 097-620040 7 Achham Kisan Micro Finance Bittiya Sanstha Ltd Binayak Binayak Achham 9802507539 8 Achham Kisan Micro Finance Bittiya Sanstha Ltd Chaukhutte Chaukhutte Achham 9802507516 9 Achham Kisan Micro Finance Bittiya Sanstha Ltd Jaigadh, Achham Jaigadh Achham 9802507491 10 Achham Kisan Micro Finance Bittiya Sanstha Ltd Kamalbazar Kamalbazar Achham 9802507480 11 Achham Kisan Micro Finance Bittiya Sanstha Ltd Santada Santada Achham 9801367774 12 Achham Mahalaxmi Bikas Bank Ltd Mangalsen Mangalsen Bazar, Accham 097-620058 13 Achham Mahalaxmi Bikas Bank Ltd Sanfee Near By Chhippe Khola, Accham, Sanfe Bagar 097-625013 14 Achham Mega Bank Nepal Ltd Sanfebagar Achham Sanfebagar 097-625149 15 Achham Nepal Investment Bank Ltd. Mangalsen Campus Road Mangalsen-5 Accham 097-620096 16 Achham Rachana Electronic Pamchadewal Binayak Pamchadewal Pamchadewal Binayak 05 Achham 097-500031 17 Achham Rasbita International Travel And Tour Pvt Ltd Achham Safebagar Aacham 9849408060 18 Achham Swabalamban Laghubitta