Project Execution Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Ocean Observatories Initiative: Establishing a Sustained and Adaptive
The Ocean Observatories Initiative: Establishing A Sustained And Adaptive Telepresence In The Ocean Shelby Walker(1) (1)National Oceanic and Atmospheric Administration, Office of Oceanic and Atmospheric Research, SSMC#3, Rm 11319, Silver Spring, MD USA shelby.walker@noaa.gov formerly National Science Foundation, 4201 Wilson Blvd., Arlington, VA, USA The significance of the ocean to our nation and Global, regional, and local climate change and world is evident and has been of increasing impacts, coastal hazards, ecosystem-based concern in recent years. In 2003 and 2004, the management and the relationship between the U.S. Commission on Ocean Policy and the Pew ocean and human health are amongst the critical Oceans Commission issued major reports with issues noted in the Commissions’ sweeping sets of recommendations designed to recommendations that point to the need for a improve society’s use and stewardship of, and sustained, research-driven, ocean observing impact on, the coastal and global ocean. These capability. The ocean science community and recommendations highlight key areas that require society at large are now poised to embark on a continuous investigation to enable timely and novel and revolutionary approach for studying sound decision-making and policy development. the ocean that calls for the establishment of an interactive, globally distributed and integrated network of sensors in the ocean. The Ocean Observatories Initiative (OOI) is part of a broader trend in the physical and natural sciences toward use of arrays of in situ sensors, real-time data, and multidisciplinary approaches to study complex natural systems [1]. The OOI, with its geographically Figure 1. -
Regional Scale Nodes a State-Of-The-Art Cabled Undersea
OOI Regional Cabled Array Winched Profiler Data for Improved Hydroacoustic Analyses 19-06-27_1430_Cram_T1.3-08 CTBT Science and Technology 2019 Conference 24-28 June 2019 Geoff Cram, Mike Harrington, Kellen Rosburg, Kevin Williams, Lisa Zurk Applied Physics Lab, University of Washington 1013 NE 40th St Seattle, WA 98115 Introduction • The Applied Physics Laboratory at the University of Washington (APL-UW) • The Ocean Observatories Initiative Regional Cabled Array (OOI-RCA) • Example profiler data from the OOI-RCA • Relevance to future modular IMS HA stations APL-UW • Founded in 1943 at the University of Washington • Vertically integrated • We design, build, deploy and conduct science with our systems Core Competencies • Underwater Instrumentation and Equipment Development • Ocean Acoustic Propagation and Systems • Experimental Oceanography • Mission-Related and Public Service Rapid Response R&D and Engineering • Simulation and Signal Processing Regional Cabled Array • Multipurpose cabled ocean observatory, funded by the US National Science Foundation Ocean Observatories Initiative • Implemented by the APL-UW in conjunction with the UW School of Oceanography • Installation completed in 2014 • 25 year system design life, going strong • Star topology with expansion capacity for ew instruments/projects RCA Overview RCA RCA Infrastructure in 2019 • 890 km of backbone cable • 7 primary nodes • 5 available ports • 18 seafloor junction boxes • 10 available ports • 6 profiling moorings • 150 oceanographic instruments, majority reporting in real -
Why SOCIB, Why Ocean Observatories, and Why Now?
7th Meeting of the Expert Group on Marine Research Infrastructure – 14 – 15 November 2011 Marine and Coastal Research Infrastructures: drive knowledge increase, transfer of technological products and management technologies for the public and private sector (Or… The impact of new information infrastructures in understanding and forecasting the changing coastal ocean: SOCIB, an international Coastal Ocean Observing and Forecasting System based in the Balearic Islands) Joaquín Tintoré and the SOCIB team SOCIB and IMEDEA (UIB-CSIC) http://www.socib.eu Outline 1. SOCIB: oceans complexity, monitoring, what, why, why now 2. Background: IMEDEA and/or 20 years of science, technology development and applications for society. Some examples of each… 3. SOCIB: why, scales, monitoring tools, particularities and ongoing activities; gliders, modeling, data center examples, ETD, SIAS 4. Innovation in oceanographic instrumentation: the case of ocean gliders. 5. The new role of Marine Research Infrastructures Oceans are complex and central to the Earth system OOI, Regional Scale Nodes (Delaney, 2008) The oceans are chronically under-sampled (Credit, Oscar Schoefield) The oceans are chronically under-sampled (Credit, Pere Oliver) Now… What is SOCIB? SOCIB is a Coastal Observing and Forecasting System, a multi-platform distributed and integrated Scientific and Technological Facility (a facility of facilities…) n providing streams of oceanographic data and modelling services in support to operational oceanography n contributing to the needs of marine and coastal research in a global change context. The concept of Operational Oceanography is here understood as general, including traditional operational services to society but also including the sustained supply of multidisciplinary data and technologies development to cover the needs of a wide range of scientific research priorities and society needs. -
A Collaborative Ocean Visualization Environment
The Design of COVE: a Collaborative Ocean Visualization Environment Keith Grochow A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy University of Washington 2011 Program Authorized to Offer Degree: Computer Science & Engineering University of Washington Graduate School This is to certify that I have examined this copy of a doctoral dissertation by Keith Grochow and have found that it is complete and satisfactory in all respects, and that any and all revisions required by the final examining committee have been made. Chair of the Supervisory Committee: _____________________________________________________ Edward Lazowska Reading Committee: ______________________________________________________ Edward Lazowska ______________________________________________________ James Fogarty ______________________________________________________ John Delaney Date: ____________________________________________ In presenting this dissertation in partial fulfillment of the requirements for the doctoral degree at the University of Washington, I agree that the Library shall make its copies freely available for inspection. I further agree that extensive copying of the dissertation is allowable only for scholarly purposes, consistent with “fair use” as prescribed in the U.S. Copyright Law. Requests for copying or reproduction of this dissertation may be referred to ProQuest Information and Learning, 300 North Zeeb Road, Ann Arbor, MI 48106-1346, 1-800-521- 0600, to whom the author has granted “the right -
Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science Presented by Ed Dever and Walt Waldorf
Ocean Observatories Initiative Ocean Observatories Initiative (OOI) Moorings: New Capabilities for Seagoing Science presented by Ed Dever and Walt Waldorf November 20, 2014 INMARTECH 2014 OOI Science Themes • Coastal and Global Scale Nodes (Global, Endurance, Pioneer) • Ocean-Atmosphere Exchange • Climate Variability, Ocean Circulation and Ecosystems • Turbulent Mixing and Biophysical Interactions • Coastal Ocean Dynamics and Ecosystems • Regional Scale Nodes • Fluid Rock Scale Interactions and the Sub-Seafloor Biosphere • Plate-Scale Geodynamics 1 INMARTECH 2014 OOI components • infrastructure (moorings, profilers, AUVs, gliders, and seafloor platforms) to measure physical, chemical, geological and biological variables at the air-sea interface, in the ocean, and seafloor. • integrated by a cyberinfrastructure to manage resources and bring data to scientists, educators and the public. • Education and Public Engagement component. • Funded by the National Science Foundation through the Consortium for Ocean Leadership (OL). OL funds the implementing organizations 2 INMARTECH 2014 Endurance Array • The Endurance Array has two lines of cross-shelf moorings (inner-shelf, mid-shelf, and slope) off Newport and Grays Harbor. • At the Newport line, the shelf and slope sites have cabled as well as uncabled platforms. • At any time, up to 6 gliders will support the Endurance array by resolving mesoscale spatial variability. 3 INMARTECH 2014 Endurance Array • uses fixed and mobile assets to observe cross-shelf and along-shelf variability in the coastal -
The Scientific and Societal Case for the Integration of Environmental Sensors Into New Submarine Telecommunication Cables I
Previous reports in the series include Using submarine cables for climate monitoring and disaster warning - Engineering feasibility study Using submarine cables for climate monitoring and disaster warning - Strategy and roadmap The scientific and societal Using submarine cables for climate monitoring and disaster warning - Opportunities and legal challenges case for the integration of environmental sensors into new submarine telecommunication cables ISBN: 978-92-61-15201-7 October 2014 9 7 8 9 2 6 1 1 5 2 0 1 7 Price: 42 CHF About ITU/UNESCO-IOC/WMO Joint Task Force on Green Cables: itu.int/go/ITU-T/greencable/ Printed in Switzerland Geneva, 2014 E-mail: greenstandard@itu.int Photo credits: Shutterstock® Acknowledgments This report was developed by the Science and Society Committee of the ITU/UNESCO-IOC/WMO Joint Task Force on Green Cables (JTF), under the leadership of Rhett Butler (Chair). This report was researched and written by Rhett Butler (USA), Elizabeth Cochran (USA), John Collins (USA), Marie Eblé (USA), John Evans (USA), Paolo Favali (Italy), Doug Given (USA), Ken Gledhill (New Zealand), Begoña Pérez Gómez (Spain), Kenji Hirata (Japan), Bruce Howe (USA), Doug Luther (USA), Christian Meinig (USA), David Meldrum (UK), John Orcutt (USA), Wahyu Pandoe (Indonesia), Johan Robertsson (Switzerland), Hanne Sagen (Norway), Tom Sanford (USA), Uri ten Brink (USA), Richard Thomson (Canada), Stefano Tinti (Italy), Vasily Titov (USA) and John Yuzhu You (Australia). The authors also wish to extend their gratitude to Thorkild Aarup (UNESCO/IOC), Jérôme Aucan (New Caledonia), Christopher Barnes (Canada), Laura Beranzoli (Italy), Kent Bressie (USA), Nigel Bayliff (UK), Francesco Chierici (Italy), Michael Costin (Australia), Antoine Lecroart (France), Yoshiki Yamazaki (USA) and Nevio Zitellini (Italy) for their contributions. -
Regional Scale Nodes Instrument Test Procedure
Ocean Observatories Initiative Regional Scale Nodes Regional Scale Nodes Instrument Test Procedure Document: 4160-66182-1901 ADCPT-2 4830-68073 First Article Test Test: First Article Test of Acoustic Doppler Current Profiler RSN Part-Serial Number: 4830-68073-0001 Mfg. Part Number: _________ Mfg. Serial Number:_________ Firmware Version: _________ Version 2-00 Prepared by University of Washington for the Ocean Observatories Initiative November 15, 2012 Ocean Observatories Initiative Regional Scale Nodes Document Control Sheet Version Release Date Description By 1-00 2012-07-25 ADCPT-JB FAT Procedure G. Dietrich 2-00 2012-11-15 Released C. McGuire Filename: 4160-66182-1901-ADCPT-2_4830-68073_First_Article_Test_RSN.doc 2/43 Ocean Observatories Initiative Regional Scale Nodes Signature Page This document has been reviewed and approved for release. RSN Senior System Engineer: . Filename: 4160-66182-1901-ADCPT-2_4830-68073_First_Article_Test_RSN.doc 3/43 Ocean Observatories Initiative Regional Scale Nodes Table of Contents 1. Test Overview ................................................................................................................................... 5 1.1. Test Plan ...................................................................................................................................... 5 1.2. Test type ..................................................................................................................................... 5 1.3. Test Description ........................................................................................................................ -
Building Transparent Data Access for Ocean Observatories: Coordination of U.S
Building transparent data access for ocean observatories: Coordination of U.S. IOOS DMAC with NSF’s OOI Cyberinfrastructure Matthew Arrott1, Charles Alexander2, John Graybeal1, Christopher Mueller3, Richard Signell4, Jeff de La Beaujardiere2, Arthur Taylor5, John Wilkin6, Brian Powell7, John Orcutt8 1Calit2, University of California at San Diego, La Jolla, CA 92093 USA 2U.S. IOOS Program Office/NOAA, 1100 Wayne Ave. Suite 1225, Silver Spring, MD 20910 USA 3Applied Science Associates, Inc. 55 Village Square Drive, South Kingstown, RI 20879 USA 4USGS Woods Hole Coastal & Marine Science Center, 384 Woods Hole Road, Woods Hole, MA 02543-1598 USA 5NOAA National Weather Service, Meteorological Development Lab, 1325 East West Highway, Silver Spring, MD 20910 USA 6Institute of Marine and Coastal Sciences, Rutgers University, 71 Dudley Road, New Brunswick, NJ 08901-8525 USA 7School of Oceanography and Earth Science and Technology, University of HI, 1680 East West Rd, Honolulu, HI 96822 USA 8Scripps Institution of Oceanography, UCSD, 9500 Gilman Drive, La Jolla CA, 92093 USA Abstract—The NOAA-led U.S. Integrated Ocean Observing providing a new research and education infrastructure to System (IOOS) and the National Science Foundation’s Ocean accelerate understanding of the ocean and seafloor and their Observatories Initiative (OOI) have been collaborating since 2007 roles in the earth system. Two coastal arrays, four global on advanced tools and technologies that ensure open access to arrays in the deep ocean, a cabled observatory over the Juan de ocean observations and models. Initial collaboration focused on Fuca tectonic plate, and a sophisticated cyberinfrastructure serving ocean data via cloud computing – a key component of the OOI cyberinfrastructure (CI) architecture. -
Cascadia Subduction Zone
White Paper: Implementation Strategies for NSF GeoPRISMS Subduction Cycles and Deformation (SCD) Initiative Deformation measurements across an entire subduction plate boundary: Cascadia Subduction Zone C. David. Chadwell, Michael D. Tryon, Uwe Send Scripps Institution of Oceanography, University of California San Diego Emails: cchadwell@ucsd.edu, mtryon@ucsd.edu, usend@ucsd.edu Proposed site: Cascadia Subduction Zone Themes addressed: (From the GeoPRISMS Draft Science Plan) 4.1 What governs the size, location and frequency of great subduction zone earthquakes and how is this related to the spatial and temporal variation of slip behaviors observed along subduction faults? 4.2 How does deformation across the subduction plate boundary evolve in space and time, through the seismic cycle and beyond? Key existing and forthcoming data/infrastructure: 1) Moored-buoy for continuous GPS- Acoustic measurements of horizontal deformation and continuous seawater pressure measurements at the seafloor with a low-drift sensor and in-situ physical oceanographic measurements for sounds speed and density. 2) Earthscope, Plate Boundary Observatory, Ocean Observatories Initiative-Regional Scale Nodes (seafloor cable) and -Endurance Array (buoys), Cascadia Initiative Ocean Bottom Seismometer array. Discussion: We propose an experiment to measure crustal deformation along a profile that crosses the entire region of a subduction zone from the incoming plate, the offshore continental slope and the sub- aerial continent. Subduction thrust faults generate the largest -
Final Hydrographic Survey Report for the Regional Scale Nodes (Rsn)
Regional Scale Nodes (RSN) Survey Report Prepared for The University of Washington FINAL HYDROGRAPHIC S URVEY REPORT FOR THE REGIONAL SCALE NODES (RSN) COMPONENT OF THE OCEAN OBSERVATORIES INITIATIVE (OOI) PREPARED FOR: REGIONAL SCALE NODES PROGRAM OFFICE 909 NE BOAT STREET SEATTLE, WA 98105-6671 TEL: 206-543-5064 JANUARY 14, 2011 PREPARED BY: L-3 COMMUNICATIONS MARIPRO, INC. WILLIAMSON & ASSOCIATES 1522 COOK PLACE 1124 NW 53RD ST. GOLETA, CA 93117 SEATTLE WA, 98107 TEL: (805) 967-0367 TEL: (206) 285-8273 Prepared by L3 MariPro i Regional Scale Nodes (RSN) Survey Report Prepared for The University of Washington EXECUTIVE SUMMARY The fiber optic cable network of the Regional Scale Nodes (RSN) component of the Ocean Observatories Initiative (OOI) is composed of eight segments located off the coast of central Oregon. The configuration of the cable routes is as follows: • Segment 1: Pacific City Oregon to Primary Node PN1A • Segment 2: Primary Node PN1A to Primary Node PN1B • Segment 3: Primary Node PN1B to Primary Node PN1C • Segment 4: Primary Node PN1C to Primary Node PN1D • Segment 4NP: Primary Node PN1D to Low Voltage Node LV01D • Segment 5: Pacific City Oregon to Primary Node PN5A • Segment 6: Primary Node PN5A to Primary Node PN3A • Segment 7: Primary Node PN3A to Primary Node PN3B The following briefly summarizes the findings of the survey interpretation on a segment by segment basis: Segment 1 • Segment 1 water depths range from 0 m at the landfall to 2920 m at Primary Node PN1A, with slopes on the lower continental slope as high as 22.5° in the survey corridor. -
THE OFFICIAL Magazine of the OCEANOGRAPHY SOCIETY
OceThe Officiala MaganZineog of the Oceanographyra Spocietyhy CITATION Kelley, D.S., S.M. Carbotte, D.W. Caress, D.A. Clague, J.R. Delaney, J.B. Gill, H. Hadaway, J.F. Holden, E.E.E. Hooft, J.P. Kellogg, M.D. Lilley, M. Stoermer, D. Toomey, R. Weekly, and W.S.D. Wilcock. 2012. Endeavour Segment of the Juan de Fuca Ridge: One of the most remarkable places on Earth. Oceanography 25(1):44–61, http://dx.doi.org/10.5670/oceanog.2012.03. DOI http://dx.doi.org/10.5670/oceanog.2012.03 COPYRIGHT This article has been published inOceanography , Volume 25, Number 1, a quarterly journal of The Oceanography Society. Copyright 2012 by The Oceanography Society. All rights reserved. USAGE Permission is granted to copy this article for use in teaching and research. Republication, systematic reproduction, or collective redistribution of any portion of this article by photocopy machine, reposting, or other means is permitted only with the approval of The Oceanography Society. Send all correspondence to: info@tos.org or The Oceanography Society, PO Box 1931, Rockville, MD 20849-1931, USA. downloaded from http://www.tos.org/oceanography OCEANIC SPREADING CENTER PROCESSES | Ridge 2000 PROGRAM RESEARCH E ndeavour Segment of the Juan de Fuca Ridge ONE of THE MosT REMARKABLE PLACES on EARTH BY DEBORAH S. KELLEY, SUZAnnE M. CARBOTTE, DAVID W. CAREss, DAVID A. CLAGUE, JOHN R. DELANEY, JAMES B. GILL, HUNTER HADAWAY, JAMES F. HoLDEN, EMILIE E.E. HoofT, JonATHAN P. KELLOGG, MARVIN D. LILLEY, MARK STOERMER, DoUG TooMEY, RoBERT WEEKLY, AND WILLIAM S.D. WILCOCK 44 Oceanography | Vol. -
Appendix A: Final Programmatic Environmental Assessment (Pea) for Nsf-Funded Ooi (June 2008)
APPENDIX A: FINAL PROGRAMMATIC ENVIRONMENTAL ASSESSMENT (PEA) FOR NSF-FUNDED OOI (JUNE 2008) [This page intentionally left blank.] FinalFinal ProgrammaticProgrammatic EnvironmentalEnvironmental AssessmentAssessment forfor NationalNational ScienceScience Foundation-FundedFoundation-Funded OceanOcean ObservatoriesObservatories InitiativeInitiative (OOI)(OOI) JuneJune 20082008 Acronyms and Abbreviations ~ approximately m meter(s) ADCP acoustic Doppler current profiler MARS Monterey Accelerated Research System ADV acoustic Doppler velocimeter MBARI Monterey Bay Aquarium Research Institute AGM absorbed glass mat MBES multibeam echosounder AWOIS Automated Wreck and Obstruction MFN Multi-function Node Information System MHz megahertz AUV autonomous underwater vehicle mm millimeter(s) BAP bio-acoustic profiler MMPA Marine Mammal Protection Act BMPs Best Management Practices MPJbox medium-power junction box CAA Clean Air Act MREFC Major Research Equipment and Facilities CDR Conceptual Design Review Construction CEQ Council on Environmental Quality ms millisecond CFR Code of Federal Regulations MSA Magnuson-Stevens Act CGSN Coastal/Global-Scale Nodes NANOOS Northwest Association of Networked cm centimeter(s) Ocean Observing Systems CND Conceptual Network Design NEPA National Environmental Policy Act CO2 carbon dioxide NHPA National Historic Preservation Act CPS Coastal Pelagic Species nmi nautical mile CSN Coastal-scale Nodes NMFS National Marine Fisheries Service CTD conductivity-temperature-depth NOAA National Oceanic and Atmospheric CWA Clean